Supermicro SuperServer AS-2124US-TNRP Bedienungsanleitung
Supermicro
Server
SuperServer AS-2124US-TNRP
Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Supermicro SuperServer AS-2124US-TNRP (1 Seiten) in der Kategorie Server. Dieser Bedienungsanleitung war für 9 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet
Seite 1/1
http://www.supermicro.com MNL-2288-QRG Rev. 1.0
A+ Server AS -2124US-TNRP Quick Reference Guide
CPU Installation
Installing a Drive
Front View & Interface Rear View
Board Layout
1. Remove the dummy drive, which comes pre-installed in
the drive carrier. Pull open the latches on the left side of
the carrier and remove the dummy.
2. Insert a drive into the carrier with the PCB side facing
down and the connector end toward the rear of the
carrier.
3. Secure the drive to the carrier by closing the latches on
the side of the carrier.
4. Insert the drive carrier with the drive into its bay, keeping
the carrier oriented so that the release button is on the
bottom. When the carrier reaches the rear of the bay, the
release handle retracts.
5. Push the handle in until it clicks into its locked position.
Caution
SAFETY INFORMATION
IMPORTANT: See installation instructions and safety warning before connecting system to
power supply.
http://www.supermicro.com/about/policies/safety_information.cfm
WARNING:
To reduce risk of electric shock/damage to equipment, disconnect power from server by
disconnecting all power cords from electrical outlets.
If any CPU socket empty, install protective plastic CPU cap
WARNING:
Always be sure all power supplies for this system have the same power output. If mixed
power supplies are installed, the system will not operate.
For more information go to : http://www.supermicro.com/support
!
!
!
DIMM Module Population Sequence
JL1
JF1
FAN7
FAN8JF2
P2-DIMMA1
P2-DIMMB1
P2-DIMMA2
P2-DIMMC1
P2-DIMMB2
P2-DIMMD2
P2-DIMMD1
P2-DIMMC2
JVR1
FAN3
FAN4
FAN5
FAN6
P2-DIMMH2
P2-DIMMG2
P2-DIMMH1
P2-DIMMF2
P2-DIMMG1
P2-DIMME2
P2-DIMMF1
P2-DIMME1
P1-DIMMD2
P1-DIMMC2
P1-DIMMC1
P1-DIMMD1
P1-DIMMA1
P1-DIMMA2
P1-DIMMB1
P1-DIMMB2
CPU1CPU2
P1-DIMMG1
P1-DIMMG2
P1-DIMMH1
P1-DIMMF2
P1-DIMMF1
P1-DIMME2
P1-DIMME1
P1-DIMMH2 FAN1
FAN2
LE1
Memory
When installing memory modules, the DIMM slots should be populated in the following order:
DIMMA2, DIMMB2, DIMMC2, DIMMD2, DIMME2, DIMMF2, DIMMG2, DIMMH2, then DIMMA1,
DIMMB1, DIMMC1, DIMMD1, DIMME1, DIMMF1, DIMMG1, DIMMH1.
• The blue slots must be populated first.
• Always use DDR4 DIMM modules of the same type, size and speed.
• Mixed DIMM speeds can be installed. However, all DIMMs will run at the speed of the slowest DIMM.
• The motherboard will support odd-numbered modules (1 or 3 modules installed). However, to achieve
the best memory performance, fully populate the motherboard with validated memory modules.
Heatsink Installation
1. Removing the Processor Force Frame
Use a Torx T20 driver to loosen the screws holding
down Force Frame in the sequence of 3-2-1. The screws
are numbered on the Force Frame next to each screw
hole.
2. Raising the Force Frame 3. Lifting the Rail Frame
5. Inserting the Carrier Frame/CPU Package 6. Lowering the Force Frame 7. Securing the Force Frame
Secure the screws in the order 1-2-3, tightening to 16.1
kgf-cm (14 lbf-in) of torque. The Force Frame secures
both the Rail Frame and CPU Package.
Caution: Tightening must be executed in proper 1-2-3 sequence
to avoid causing catastrophic damage to the socket or CPU
Package.
8. The Force Frame Secured
1. Mounting the Heatsink
S #1crew
S #2crew
S #3crew
Force ram F e
Rail ram F e
PnP Co pver Ca
Carr er ramei F /
CPU P geacka
Processor Installation
2. curing the HeatsinkSe
Using a diagonal pattern and a Torx T20 driver,
tighten the four heatsink screws evenly to 16.1
kgf-cm (14.0 lbf-in) torque.
4. Removing the External Cap and PnP Cover Cap
E nal pxter Ca
PnP Co pver Ca
#4 cre S w
#2 cre S w
#1 cre S w
#3 cre S w
3
+
DESIGNED IN USA
H12DSU-iN
REV:
12
8
9
10
6
4 5
11 12 13 14 15 16
7
No. t nDescrip io
1SXB1 1 : -L s S t P PCI-E 4.0 )A/ B/1C WIO Ri er Card uppor (C U2 x32
2SXB2: S t P PCI-E 4.0 x )WIO-R Riser Card uppor (C U2 16
3SXB3 3 : t S t P PCI-E 4.0 )A/ B/3C Ul ra I/O Riser Card uppor (C U1 x40
4CPU1 NV 0- S A 7Me Ports 1, AT 0-
5S AAT DOM 3.0 98-
6CPU2 NV S A 3Me Port 0, AT 10-1
7CPU2 VNM e Port 1, S AAT 14-17
8CPU1 NV 3Me Ports 2-
9CPU2 NV 3Me Ports 2-
10 JBT1 - CMOS Clear
11 CPU2 DI A S tsMM 1-D2 lo
12 CPU2
13 CPU2 DI E otsMM 1-H2 Sl
14 CPU1 DI A S tsMM 1-D2 lo
15 CPU1
16 CPU1 DI E S tsMM 1-H2 lo
2
Hard Drive Installation
Removing a Hot-Swap Drive
Carrier from the Chassis
1. Press the release button on the drive carrier,
which will extend the drive carrier handle.
2. Use the drive carrier handle to pull the drive
out of the chassis.
2 3 4 5 7
11 6
1
Default Cable Routing
I m F u ste eat re
1 Two redundan power supply module t s
2 Two 45 RJ ports and two 10G SFP+ ports
3 Two por U 3.0 SB ts
4 MI t LAN tIP dedica ed por
5 AVG
6 UID LED
7 COM tpor
8 G t , SLG E4TAOC- 2UR68 4-i4XTS slo #1 in alledst AOC- 4-4
9 G t , SLG E4TAOC-2UR68 4-i4XTS slo #2 in alledst AOC- 4-2
10 G t s t , SLG E4TAOC-2UR68 4-i4XTS in ernal lo #3 in alledst AOC- 4-2
11 RS W t , t SLG E4TC- R-6 slo #4 ins alled AOC- 4-4
12 PCI-E 4.0 x s t (FH 9. L/ . P )16 lo 5” 10 5” L) (C U2
13 RS W G4 t , t SLG E4TC- 2-66 slo #6 ins alled AOC- 4-4
8
9
10 11 13
12
C or Bo donnect on ar Card/ C n onn ioect
Backplane HDD Ba MC Ca y S bl P/e N
JS SASLI (P1 NV / , B S ) NV 1 1 CBM1 Me0 1) (M -H12D U-iN Me 0- L- T-1268-85
JS SASLI (P1 NV / , B S ) NV 3 3 CBM2 Me2 3) (M -H12D U-iN Me 2- L- T-1256 -8A 5
AO XTS SASC- 2UR68 4-i4 G s SLG E4T NV 5 & 7 7 CBlot, AOC- 4-4 Me 4- L- T-1282-85
AO XTS SASC-2UR68 4-i4G t s SLG E4T NV 9 9 CBin ernal lot, AOC- 4-2 Me 8- L- T-1265 -8A 5
AO XTSC-2UR68 4-i4G s S E4T NV 11 11 CB Tlot, AOC- LG4-2 Me 10- L-SAS -1265 -8A 5
JS SASLI &2 (P2 NV / , B S ) NV 13 3 CBM3-1 Me0 1) (M -H12D U-iN Me 12-1 L- T F 5-1262 -8
JS SASLI (P1 NV / , B S ) NV 15 5 CBM4 Me2 3) (M -H12D U-iN Me 14-1 L- T-1248-85
RS W G4 s SLG E4T NV & 19 9 CB TC- 2-66 lot, AOC- 4-4 Me 17 16-1 L-SAS -1282-85
RS W s SLG E4T NV & 23 3 CB TC- R-6 lot, AOC- 4-4 Me 21 20-2 L-SAS -1265 -8A 5
CPU1 CPU2
(NVMe with optional parts support for SAS/SATA)
HDD 0-11 HDD 12-23
Pro o a their Co o M escess rs nd rresponding Mem ry odul
CPU# Cha el nn
1Cha el nn
2Cha el nn
3Cha el nn
4Cha el nn
5Cha el nn
6Cha el nn
7Cha el nn
8
8 DI SMM
CPU1 A2 B2 C2 D2 E2 F2 G2 H2
16 MM DI S
CPU1 A1 A2 B1 B2 C1 C2 D1 D2 E1 E2 F1 F2 G1 G2 H1 H2
16 MM DI S
CPU1 A2 B2 C2 D2 E2 F2 G2 H2
CPU2 A2 B2 C2 D2 E2 F2 G2 H2
32 MM DI S
CPU1 A1 A2 B1 B2 C1 C2 D1 D2 E1 E2 F1 F2 G1 G2 H1 H2
CPU2 A1 A2 B1 B2 C1 C2 D1 D2 E1 E2 F1 F2 G1 G2 H1 H2
1
6
5
4
3
7
2
8
10
9
I m F u ste eat re
1 P onower Butt
2 setRe
3 P LEDower
4 NI LEDC2
5 P F LEDower ail
6 DHD
7 NI LEDC1
8 Inf LEDormation
9 sStorage Drive
10 Asse vice Tagt/Ser
Produktspezifikationen
Marke: | Supermicro |
Kategorie: | Server |
Modell: | SuperServer AS-2124US-TNRP |
Brauchst du Hilfe?
Wenn Sie Hilfe mit Supermicro SuperServer AS-2124US-TNRP benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Server Supermicro
6 September 2024
6 September 2024
6 September 2024
5 September 2024
5 September 2024
5 September 2024
5 September 2024
5 September 2024
4 September 2024
29 August 2024
Bedienungsanleitung Server
- Server Acer
- Server Asus
- Server Gigabyte
- Server HP
- Server Medion
- Server Sony
- Server ZyXEL
- Server Buffalo
- Server Allnet
- Server Linksys
- Server Netgear
- Server Fantec
- Server Technics
- Server Abus
- Server Megasat
- Server Toshiba
- Server Lindy
- Server Dell
- Server Lenovo
- Server Tripp Lite
- Server TRENDnet
- Server Western Digital
- Server AVerMedia
- Server Veritas
- Server Black Box
- Server SilverStone
- Server NEC
- Server Monacor
- Server Seagate
- Server Fujitsu
- Server Maxdata
- Server Revox
- Server Totolink
- Server Conceptronic
- Server D-Link
- Server QNAP
- Server Digitus
- Server LevelOne
- Server APC
- Server Cisco
- Server Freecom
- Server Synology
- Server Kramer
- Server Intellinet
- Server Eaton
- Server Hikvision
- Server FLIR
- Server ELAC
- Server Planet
- Server Asustor
- Server Blackmagic Design
- Server Dane Elec
- Server Digi
- Server Dual Bay
- Server EMC
- Server GeoVision
- Server Ibm
- Server In Win
- Server Iomega
- Server LaCie
- Server Provision ISR
- Server Quantum
- Server Sun
- Server AMX
- Server ACTi
- Server Vimar
- Server Siig
- Server Intel
- Server Moxa
- Server StarTech.com
- Server Smart-AVI
- Server Mobotix
- Server Sonnet
- Server SEH
- Server Gefen
- Server Avocent
- Server Atlantis Land
- Server Hanwha
- Server ATen
- Server KanexPro
- Server Axis
- Server Advantech
- Server HGST
- Server Kiloview
- Server B&B Electronics
- Server Extron
- Server Atlona
- Server Rocstor
- Server Raidsonic
- Server G-Technology
- Server Infortrend
- Server Areca
- Server Silex
- Server Promise Technology
- Server Matrox
- Server Origin Storage
- Server Ernitec
- Server EXSYS
- Server Raritan
- Server C2G
- Server Chenbro Micom
- Server Lantronix
- Server IStarUSA
- Server Valcom
- Server TAIDEN
- Server MvixUSA
- Server Opengear
- Server Mr. Signal
- Server NETSCOUT
Neueste Bedienungsanleitung für -Kategorien-
13 Oktober 2024
12 Oktober 2024
12 Oktober 2024
11 Oktober 2024
11 Oktober 2024
10 Oktober 2024
6 Oktober 2024
4 Oktober 2024
3 Oktober 2024
3 Oktober 2024