Draper Ultimate Access V Bedienungsanleitung
Draper
Projektionsleinwand
Ultimate Access V
Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Draper Ultimate Access V (1 Seiten) in der Kategorie Projektionsleinwand. Dieser Bedienungsanleitung war für 6 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet
Seite 1/1
Bottom Access Panel/Trap Door Opening & Closing
A spring latch near the center
of the case and at each end
of the trap door holds this
assembly closed. The center latch
must be disengaged first. To gain
access to inside of screen
case, disengage spring
latch at center, followed by
the latches at each end. To
disengage, slide the latch lever
towards the center of screen
case (see Fig. 2), then pull
down slightly on the trap door
assembly. The latch levers are
somewhat concealed from view.
Locate these with the trap door
open by feeling for the vertical latch
lever above the door about 3" from case
endcaps and near the center of the case.
The assembly will swing down, opening about 135 . Pivot the prop arms at ˚
each end of the trap door assembly towards the ends of screen case. Prop
arms engage with a hole in each endcap to hold the trap door assembly fully
open. To close the trap door assembly disengage prop arms from endcaps
and pivot these over the access panel. Swing the trap door assembly upward,
stopping just before the latch levers hit the bottom flanges of the endcaps
(and center of case where appropriate). Pull levers of latches towards center
of screen case to allow the trap door assembly to be pivoted to its closed
position. Make sure that the spring latch levers engage fully with case endcaps
(and center of case where appropriate).
Caution
1 Read instructions through completely before proceeding.
2 Follow instructions carefully. Installation contrary to instructions
invalidates warranty.
3 Entire bottom of screen case should be unobstructed to permit
access to bottom panel for electrical connections or servicing.
4 Screen should be installed level (using a carpenter’s level).
5 Nothing should be fastened to screen dowel or viewing surface.
6 Operating switch(es) and mounting brackets are packed separately
in screen carton. Do not discard with packing material.
7 Screen operates on 110-120V, 60 Hz. AC, 1.1 amp current draw.
NOTE: Screen has been thoroughly inspected and tested at factory
and found to be operating properly prior to shipment.
Electrical Connections
Screen operates on 110-120V, 60 Hz., 1.1 amp current draw.
Junction box is located just above the bottom access panel at the left end of
the screen.
Open the access panel/trap door for access to the junction box cover. (See
bottom access panel/trap door opening and closing instructions below).
Remove two (2) hex head screws that secure the cover to the junction box to
expose the red, black, and white pigtail leads and the green ground wire per
wiring diagram on page 3.
If optional low voltage control or video interface control is specified and factory
installed, please refer to wiring diagrams on pages 3-4.
Screen is shipped with internal wiring complete and control switch(es) fully
boxed. Wire to connect screen to switch(es) and switch(es) to power supply
should be furnished by installer. Connections should be made in accordance
with attached wiring diagram, and wiring should comply with national and local
electrical codes.
All operating switches should be “off” before power is connected.
Suitable for use in environmental air space in accordance with Section
300-22(c) of the National Electrical Code, and Sections 2-128, 12-010(3)
and 12-100 of the Canadian Electrical Code, Part 1, CSA C22.1.
Caution: Beware of pinch
points along closure
Hanging Screen
When locating viewing surface and checking clearance for screen operation,
remember surface is centered in the length of the case. Regardless of mounting
method used, the following points apply:
1 Mounting brackets are shipped attached to the case. Engage each bracket
with top of housing as shown below and tighten set screws (see fig 1).
2 Screen should be positively and securely supported so that vibration or
even abusive pulling on viewing surface will not weaken installation.
Please Note: A Hoisting Bracket is included on each end of the case to
aid in overhead installation of the Ultimate Access case.
3 Installer must insure that fasteners used are of adequate strength and
suitable for the mounting surface chosen. Supporting hardware (chains,
cables,
3
/
8
" rods, etc.) must be essentially vertical.
4 Entire bottom of case must be readily accessible after installation is complete.
5 Front, back and top of case must be straight—not forced to warp or bow.
6 If case is painted on location, slot on bottom of case should be shielded to
protect viewing surface from paint splatters/overspray.
7 Do not seal unit in ceiling until electrical connections have been made and
screen has been operated successfully.
With typical installation, brackets may be angled to meet installation requirements.
Figure
HOISTING
BRACKET
CASE
MOUNTING
BRACKET
7/8”
ELECTRICAL
CUTOUT
HOISTING
BRACKET
CASE
MOUNTING
BRACKET
ACCE S
DOOR
LA C
ACCESS DOOR
S PPOR
BRACKE
ACCESS
DOOR
LATCH
ACCESS DOOR
SUPPORT
BRACKET
SLIDE
TRAP DOOR
(up position)
CASE
INTERIOR
Figure
Figure
Removing Shipping Brackets
DO NOT OPERATE SCREEN BEFORE REMOVING THESE SHIPPING
BRACKETS FROM THE SCREEN CASE
1 Loosen and remove fasteners
from both bracket clamps that are
attached to the screen case.
2 Run the screen to expose DOWN
bracket clamp fasteners attached
to the screen dowel.
3 Loosen screws holding bracket to
dowel endcap enough to remove
the bracket.
4 Re-tighten dowel endcap screws.
3. Loosen screws
and remove the
shipping bracket.
1. Remove Fasteners
from Bracket Clamps
2. Run the screen
DOWN to expose
the Dowel Screws
4. Retighten dowel
endcap screws.
If you have any difficulties installing or servicing your
Ultimate Access Projection Screen, call your dealer or Draper, Inc.
Ultimate Access E & V
Electric Projection Screen
INSTRUCTIONS
INSTALLATION & OPERATION
Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385
draperinc.com | 765.987.7999 | 800.238.7999
© 2018 All Rights Reserved | FORM: UltimateAccess_Inst18
Please Note: Bracket must be removed in
order to move screen into or out of case.
Produktspezifikationen
Marke: | Draper |
Kategorie: | Projektionsleinwand |
Modell: | Ultimate Access V |
Gewicht: | 77111 g |
Befestigungstyp: | Zimmerdecke |
Menge pro Packung: | 1 Stück(e) |
Natives Seitenverhältnis: | 15:9 |
Diagonal: | 121 " |
Gesamte Bildschirmgröße (Höhe x Breite): | 154 x 264 cm |
Brauchst du Hilfe?
Wenn Sie Hilfe mit Draper Ultimate Access V benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Projektionsleinwand Draper
25 Mai 2024
14 März 2024
16 Dezember 2023
2 Dezember 2023
20 September 2023
5 September 2023
17 August 2023
12 August 2023
14 Juni 2023
14 Juni 2023
Bedienungsanleitung Projektionsleinwand
- Projektionsleinwand Da-Lite
- Projektionsleinwand Sony
- Projektionsleinwand Pyle
- Projektionsleinwand Optoma
- Projektionsleinwand Celexon
- Projektionsleinwand Projecta
- Projektionsleinwand AV:link
- Projektionsleinwand Oregon Scientific
- Projektionsleinwand Duronic
- Projektionsleinwand Luxburg
- Projektionsleinwand EluneVision
- Projektionsleinwand Stewart
- Projektionsleinwand Elite Screens
- Projektionsleinwand Instaal
Neueste Bedienungsanleitung für -Kategorien-
2 Juni 2024
2 Juni 2024
22 Mai 2024
21 Mai 2024
16 Mai 2024