Da-Lite Tensioned Large Advantage Electrol 37018L Bedienungsanleitung
Da-Lite
Projektionsfläche
Tensioned Large Advantage Electrol 37018L
Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Da-Lite Tensioned Large Advantage Electrol 37018L (12 Seiten) in der Kategorie Projektionsfläche. Dieser Bedienungsanleitung war für 11 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet
Seite 1/12
INSTRUCTION BOOK FOR
Tensioned Large
Advantage® Electrol®
2
Tools Required for Installation
1. The case provides multiple attachment points for bolts,
cables, or threaded rod. Page 4 shows threaded rod
installed. The variable position-mounting bracket may be
located anywhere along the length of the case. It is
recommended to keep the brackets spaced evenly enough
to distribute the weight of the screen. One mounting bracket
is required for every 4' of case length.
2. Tighten bolts until trim lange is lush with ceiling.
NOTE: For proper operation, screen assembly must be level
after installation.
3. Remove 2 screws to open junction box. Install electrical
connections that apply to your unit. Make sure to review the
wiring diagram for proper hook up. Replace junction box
cover and secure with 2 screws.
NOTE: Please Note: Motor Operator Projection Screen
Models LADT, LADDT, LAD and LADD must be installed in
accordance with the requirements of the Local Building
Codes, the Canadian Electrical Code (CEC), CAN/CSA C22.1
and the National Electric Code (NEC), NFPA 70. An
appropriate disconnect device shall be provided as part of
the building installation.
If your case was ordered in advance of the screen and roller
assembly, your installation is now complete. Continue to
step 4 if your Tensioned Large Advantage Electrol was
ordered as a complete unit.
4. Carefully remove paper and tape from roller assembly
CAUTION! Do not use a knife or sharp object to cut tape;
you will damage the screen. Pull orange string.
ATTENTION! Ne coupez pas le ruban adhésif sur la toile
avec un couteau ou un outil tranchant. Retirez à la main.
5. Use supplied 1/8" hex key to remove silver shipping brackets
attached to slat and screen case.
6. Test installation by running screen up and down a few times.
Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor,
the standard duty cycle is 1 minute on and 3 minutes of.
Case Installation
Important Safety Instructions
When using your video equipment, basic safety precautions
should always be followed, including the following:
1. Read and understand all instructions before using.
2. Position the cord so that it will not be tripped over, pulled,
or contact hot surfaces.
3. If an extension cord is necessary, a cord with a current rating
at least equal to that of the appliance should be used. Cords
rated for less amperage than the appliance may overheat.
4. To reduce the risk of electric shock, do not disassemble this
appliance. Contact an authorized service dealer when repair
work is required. Incorrect reassembly can cause electric
shock when the appliance is used subsequently.
5. The use of an accessory attachment not recommended
by the manufacturer may cause a risk of ire, electric shock,
or injury to persons.
Pre-Installation
1. Carefully unpack case from shipping crate.
2. Set aside the Installation Kit. Items inside will be used during
installation.
3. Make sure to recheck measurement of case for proper
installation clearance.
4. Remove any protective foam from case.
5. If necessary. adjust hanger brackets with a 3/4" open wrench
or socket driver.
3/4“ Open Wrench
or Socket Driver
1/8“ Hex Key
(included)
3
If your screen was shipped with the motor and roller already installed proceed to step 7.
1. Remove the access door. First, remove the 2 bolts from each
end with a 9/16" open wrench or socket driver. Next, use a 5/32"
hex key to remove the two screws in the center of the access
door. This will allow the door to drop open on the hinges
(Figure 1).
2. Carefully unpack screen and roller assembly. Use supplied 1/8"
hex key to remove shipping brackets attached to slat. Remove
fabric and roller assembly from shipping board using a 1/2"
wrench. Leave packing paper on roller.
3. Remove the square peg bracket from the motor end of the
roller assembly (Figure 2).
4. Remove the safety clip from the motor attachement bracket
located in the motor end of the screen housing.
5. Use a 1/2" open wrench or socket driver to loosen the four
bolts that secure pin end mounting bracket into housing. Lift
pin end of roller into position and slide the bracket into the
roller pin. Tighten all four bolts. Slide the pin end bracket
towards the end of the case (Figure 3).
6. Place the roller assembly into the case with the motor on the
left side. The limit switches should be facing down. Line up the
head of the motor with the motor attachment bracket.
7. Complete electrical hook-up by snapping motor 1/3 wire
connectors into case connectors (Figure 2).
8. Return to motor end and insert safety clip over casting bracket
to secure motor end.
9. Carefully remove tape strips securing picture surface around
roller. Slat should move freely. (Only if the roller assembly is pre
installed.)
CAUTION! Do not cut tape on fabric with a knife or any
sharp tool. Remove by hand.
ATTENTION! Ne coupez pas le ruban adhésif sur la toile
avec un couteau ou un outil tranchant. Retirez à la main.
10. Test installation by running screen up and down a few times.
Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor, the
standard duty cycle is 1 minute on and 3 minutes of.
11. Re-install the access door. Procedure is the reverse of step 1
listed above.
Screen And Roller Assembly Installation
Tools required for screen and roller assembly:
Bolts
Bolts
Figure 3Figure 1 Figure 2
Bolts
Access
Door
Door Support
Screws
Screen Motor
LVC Control Box
Screen Motor
Limit Switches
9/16“ Open Wrench
or Socket Driver
1/2“ Open Wrench
or Socket Driver
5/32“ Hex Key 1/8“ Hex Key
(included)
Produktspezifikationen
Marke: | Da-Lite |
Kategorie: | Projektionsfläche |
Modell: | Tensioned Large Advantage Electrol 37018L |
Brauchst du Hilfe?
Wenn Sie Hilfe mit Da-Lite Tensioned Large Advantage Electrol 37018L benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Projektionsfläche Da-Lite
2 Oktober 2024
27 September 2024
11 September 2024
5 September 2024
2 September 2024
1 September 2024
31 August 2024
17 August 2024
10 August 2024
10 August 2024
Bedienungsanleitung Projektionsfläche
- Projektionsfläche Pyle
- Projektionsfläche Optoma
- Projektionsfläche Kodak
- Projektionsfläche NEC
- Projektionsfläche Celexon
- Projektionsfläche Elite
- Projektionsfläche AV:link
- Projektionsfläche Draper
- Projektionsfläche Oregon Scientific
- Projektionsfläche Duronic
- Projektionsfläche GPX
- Projektionsfläche Luxburg
- Projektionsfläche EluneVision
- Projektionsfläche Stewart
- Projektionsfläche Elite Screens
- Projektionsfläche Lumene
- Projektionsfläche Avers
- Projektionsfläche Elite ProAV
- Projektionsfläche KHOMO GEAR
- Projektionsfläche EPV
Neueste Bedienungsanleitung für -Kategorien-
12 Oktober 2024
29 September 2024
20 September 2024
7 September 2024
6 September 2024
6 September 2024
5 September 2024
4 September 2024
4 September 2024
Celexon Ultramobile Plus Professional 194 x 146 Bedienungsanleitung
3 September 2024