Sanibroyeur Sanipump ZPG 71 Bedienungsanleitung

Sanibroyeur pomp Sanipump ZPG 71

Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Sanibroyeur Sanipump ZPG 71 (18 Seiten) in der Kategorie pomp. Dieser Bedienungsanleitung war für 12 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/18
SANIPUMP®ZPG71
9035
02.20
EN
Submersible greywater pump Operating/installation manual
DE
Abwasser-Tauchpumpe Bedienungs-/Installationsanleitung
FR
Pompe submersible pour évacuation des eaux grises
Notice de service/montage
ES
Bomba sumergible para aguas residuales Manual de funcionamento
IT
Pompa sommersa per acque reflue Manuale per l’uso e l’installazione
NL
Afvalwater-dompelpomp Gebruikers-/installatiehandleiding
PT
Bomba submersível para águas residuais
Manual de instalação/utilização
English 3 ......................................
Deutsch 14 .....................................
Français 26 ....................................
Italiano 38 .....................................
Nederlands 50 ................................
Español 62 .....................................
Português 74 .................................
10
- Sound out position of guide pipe frame for coupling pedestal, adjust coupling pedestal on shaft bottom and
mount it with the heavy-duty dowels which are included in the delivery.
- Install pressure pipe and valves in a tension-free manner.
- Slip the guide pipe on the coupling pedestal, shorten it to correct length, slip on pipe clamp and tighten it for good.
- Mount coupling element and lowering chain to the pump, lower pump with the chain (insert guide pipe into
coupling element) and couple it, hang the chain up on the pipe clamp so that it is ready to hand.
- Lay supply cable. Avoid kinks and lay supply cable without tensile loading and without causing chafe marks.
5.3 Level control system
The pumps SANIPUMP® ZPG 71 have to be controlled by means of a level control in such a way, that a
decline of the water level beneath the minimum allowable level (bottom line of motor housing) is avoided at
all costs.
The level control can be effected by means of a oating switch, electropneumatically (press switch) or by
means of other applicable methods. The switching point of the pump should be set in such a way, that the
pump is entirely submersed under water.
6. COMMISSIONING
Check all connections for correct assembly, set gate valve on passage and check level control system
for proper operation.
During the initial test run, check pipes for tightness and reseal them, if necessary.
7. MAINTENANCE AND REPAIR
Disconnect the power supply before carrying out any kind of
work on the plant!
After an operation time of six to twelve months, the oil storage inside the seal carrier always has to be
controlled as follows:
- put the pump on its side on a clean surface and position it in such a way that the oil lling screw faces upwards,
- take out the screw and check the oil level.
If only a small quantity of oil is lacking, the oil storage can be filled up without any problems. If a
considerable quantity of oil is lacking, or if the oil is mingled with water, the customer department has
to be informed.
All other maintenance works on the pump and on the electrical equipment should be carried out by the
manufacturer or an authorised qualified company in intervals of six to twelve months (or also in shorter
intervals, according to case of operation). Please immediately inform the customer department in case
of damage to the pump and/or the electrical equipment.
8. MALFUNCTIONS, CAUSES AND TROUBLESHOOTING
Disconnect the power supply before carrying out any kind of work
on the plant!


Produktspezifikationen

Marke: Sanibroyeur
Kategorie: pomp
Modell: Sanipump ZPG 71

Brauchst du Hilfe?

Wenn Sie Hilfe mit Sanibroyeur Sanipump ZPG 71 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung pomp Sanibroyeur

Bedienungsanleitung pomp

Neueste Bedienungsanleitung für -Kategorien-