Intellinet 561969 Bedienungsanleitung


Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Intellinet 561969 (16 Seiten) in der Kategorie Schalten. Dieser Bedienungsanleitung war für 18 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/16
Scan to
register your
product warranty
Important: Read before use. • Importante: Leer antes de usar.
For additional benets:
or go to: register.intellinet-network.com/r/561969
54-Port L2+ Fully Managed PoE+
Switch with 48 Gigabit Ports and 6
SFP+ Uplinks
Instructions
Model 561969 (IPS-54GM06-10G-450W)
2
This guide presents the basic steps to set up and operate this device.
For the user manual and specifications, visit intellinet-network.com.
Register your product at register.intellinet-network.com/r/561969
or scan the QR code on the cover.
Placement
Prior to use, it is recommended that the switch be placed/positioned:
on a level surface that can support the
weight of the switch (and any other
items that need to be considered);
with a minimum of 25 mm
(approx. 1”) of clearance
on the top and sides for adequate ventilation;
away from sources of electrical noise: radios,
transmitters, broadband amplifiers, etc.;
where it cannot be affected by excessive moisture;
within 100 m (approx. 328’) of network devices it’s to be connected to.
The switch includes brackets and screws for optional rack mounting.
1 Disconnect any cables from the switch.
2 Position a bracket over the mounting
holes on one side of the switch and
secure it in place with screws.
3 Repeat Step 2 on the other side of the switch.
4 Position the switch in the rack and
screw the brackets to the rack.
5 Reconnect any cables.
Chassis Ground Column
Located on the side of the power supply connector, a grounding terminal
connector is used to provide proper grounding for your Intellinet Network
Solutions switch. If you use the chassis grounding screw, it should be
wired to an object that provides earth ground. In rackmount installations,
grounding is typically provided by the metal frame of the mounting rack.
English
Instructions
3English
Connections
All ports on the switch support Auto-MDI/MDI-X functionality,
so you can use straight or crossover UTP/STP cables to connect
the RJ45 ports to PCs, routers, hubs, other switches, etc.
Cat5e/6/6a/8.x UTP/STP cables provide optimal performance;
if a status LED doesn’t indicate a link or activity, check the
corresponding device for proper setup and operation.
Use the included power cable to connect the receptacle
on the back of the switch to a power outlet.
LED Color Status Operation
PWR Green Flashing The LEDs of ports 1 – 48 are showing PoE status.
Off The LEDs of ports 1 – 54 are showing Link status.
RUN Green Flashing System is booting.
On System has booted successfully.
1–48
Link/
PoE*
Green
On Valid port connection. / The connected
device (PD) is receiving power.
Flashing Data transmitted/received.
Off No link established. / No powered device
(PD) is connected to the port.
49S–54S
(SFP+) Green
On Valid port connection.
Flashing Data transmitted/received.
Off No link established.
* NOTE: Press the CTRL button to alternate between Link or PoE Status.
Basic Web-Based Browser Management
1 Open your Web browser.
2 http://Enter and the IP address of the switch in the Address
field. The default management IP address is . 192.168.2.1
3 EnterPress to display the login screen. In the Username
field, enter ; in the Password field, enter the admin serial
number OK on the bottom of the switch. Click .
*
Instructions


Produktspezifikationen

Marke: Intellinet
Kategorie: Schalten
Modell: 561969

Brauchst du Hilfe?

Wenn Sie Hilfe mit Intellinet 561969 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Schalten Intellinet

Bedienungsanleitung Schalten

Neueste Bedienungsanleitung für -Kategorien-