Ferroli Theta+ Bedienungsanleitung


Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Ferroli Theta+ (40 Seiten) in der Kategorie Nicht kategorisiert. Dieser Bedienungsanleitung war für 4 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/40
Control System
For the heating specialist
Operating and installation
instructions
Standard unit
Remote unit RS
Boiler control panel
É
2
Contents
General safety instructions ............................................................. 3
Safety measures for EMC - conform installation
......................... 3
Standard unit .................................................................................. 5
Mounting .............................................................................................................. 5
Electrical installation ............................................................................................ 5
Terminal assignment ........................................................................................... 6
Boiler control panel ........................................................................ 7
Mounting .............................................................................................................. 7
Electrical installation ............................................................................................ 7
Terminal assignment ........................................................................................... 8
Wall socket MS-K ........................................................................... 9
Electrical installation ............................................................................................. 9
Terminal assignment ......................................................................................... 10
Room control unit RS .................................................................. 11
Mounting location ............................................................................................... 11
Mounting ............................................................................................................ 11
Terminal assignment ......................................................................................... 12
Electrical connections (control unit) ................................................................... 12
Data bus addressing .......................................................................................... 12
Equipment ..................................................................................... 14
Outdoor sensor AF (OT) .................................................................................... 14
Immersion sensor KVT ...................................................................................... 14
Flow sensor VF .................................................................................................. 15
Resistance values of the sensor elements versus temperature ........................ 16
Starting up the control unit ............................................................ 17
Code-Input ......................................................................................................... 17
Automatic SET-Function ............................................................. 18
Alarm messages ........................................................................... 20
Heating system information ........................................................ 21
Level synoptic .............................................................................. 25
Synoptic of the specialist parameters and control options ............................... 28
3
General safety instructions
All electrical connections and safety
measures have to be carried out by a
specialist according to the valid norms
and VDE-guidelines as well as the local
instructions.
The electrical connection must be fix (see
instructions by VDE 0100).
The electrical connection has to be done
according to the wiring diagram of the
respective boiler control panel.
Important!
Deenergize the boiler before opening.
Unprofessional plugging attempts under
voltage may damage the control or
cause dangerous electrical shocks.
Safety measures for EMC -
conform installation
1. Cables with mains voltage must be
generally installed separately from
sensor and data bus cables. In this
case a minimum distance of 2 cm must
be observed. Crossing of lines is
permitted.
2. Controls with own mains connection
require a separate installation of mains
and sensor or data bus cable. When
using cable ducts such with internal
separators are recommended.
3. Installing control or remote units close
to other components with electro
magnetic emission such as solid state
relays, motors, transformers, dimmers,
micro wave ovens, TV-sets, loud-
speakers, computers, radio telephones
etc. a minimum distance of 40 cm
must be observed.
4. Between remote units and standard
unit a minimum distance of 40 cm has
to be observed. Several standard units
may be installed side by side.
5. The mains connection of the heating
plant (standard unit or boiler control
panel) must be carried out as an
independent electric circuit. It is not
permitted to install fluorescent tubes or
other machines that could produce
interferences to the same electrical
circuit.
Fig. 1: Minimum distance for cable installations
Data bus cable 12 V~
2cm
Mains 230 V~
Fuse 16 A
Emergency-switch
Install fluorescent
tubes and plugs on
separated circuits.
Remote unit(s)
Heat generator
Fig. 3: Leading of electrical cables in the boiler
room
40 cm
Fig. 2: Minimum distance to other electric supply
15 cm


Produktspezifikationen

Marke: Ferroli
Kategorie: Nicht kategorisiert
Modell: Theta+

Brauchst du Hilfe?

Wenn Sie Hilfe mit Ferroli Theta+ benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Nicht kategorisiert Ferroli

Bedienungsanleitung Nicht kategorisiert

Neueste Bedienungsanleitung für -Kategorien-