Dormakaba BTS75V Bedienungsanleitung


Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Dormakaba BTS75V (10 Seiten) in der Kategorie Schwelle. Dieser Bedienungsanleitung war für 13 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/10
BTS75V/A,G, 75V BF/A,G, 80/A,G
Package A & G
Aluminum door & frame, center hung
Single and double acting
Installation instructions
08076341 – 02-2021
| | EN
2BTS80 Closers 02-202108076341
dormakaba BTS75V/A,G, 75V BF/A,G, 80/A,G
Installation Instructions
Table of Contents
Table of contents
1 Installation 3
1.1 Attach spindle and install closer 3
1.2 Adjust pivot for door clearance 3
1.3 Install pivot channel in top of door 3
1.4 Install bottom arm in bottom of door (7422) 4
1.5 Install the door 4
2 Templates 5
2.1 Top pivot template 5
2.2 Bottom arm (7422) template 6
2.3 Cement case template 7
3 Adjustments 8
3.1 Adjust bottom door clearances (if necessary) 8
3.2 Adjust closing speeds 8
3.3 Adjust spring tension (if necessary) 9
3.4 Sealing compound (optional) 9
4 Covers 9
4.1 Install cover 9
dormakaba BTS75V/A,G, 75V BF/A,G, 80/A,G
Installation Instructions
08076341 02-2021BTS80 Closers 3
Installation
. Attach spindle and install closer
1 Installation
. Adjust pivot for door clearance
Fig.
Fig.
1.1.1 Slide washer over tapered
square end of spindle until
fully seated in groove.
1.1.2 Fasten spindle with
spindle screw provided.
1.1.3 Tighten securely with
5mm hex key.
LH
1.1.4 Center closer in cement case.
1.1.5 Tighten fastening screws.
NOTE: Top of cement case must be flush with finished floor.
NOTE: Cement case must be level and installed parallel to frame.
NOTE: Spindle center line must be accurately located.
NOTE: Grout cement case in place.
RH
Single acting applications
3° offset spindle
Stop side
Double acting applications
Standard spindle
CRITICAL:
WASHER MUST BE INSTALLED
Spindle screw
Spindle
Washer
Fastening screws
Finished floor
. Install pivot channel in top of door
Fig.
1.2.1 Determine clearance between
door and frame, and adjust
projection of pivot pin, if
required.
NOTE: Pivot pin projection allows
1/8” clearance as shipped
from the factory.
1.2.2 Remove walking beam pivot
screw.
1.2.3 Push pivot pin out until walking
beam is disengaged.
1.2.4 Install extended pivot pin and
engage walking beam into
appropriate hole in pivot pin to
obtain required projection.
NOTE: Be sure opposite end of
walking beam is engaged in
adjustment screw.
1.2.5 Reinstall walking beam pivot screw.
1.2.6 Retract pivot pin: turn adjustment screw
CCW and install pivot into header.
1.2.7 Install cover plate.
1.3.1 Fasten pivot channel in top of door.
1.3.2 Place bearing insert into pivot channel.
1.3.3 Turn adjustment screw approximately
halfway into pivot channel.
1.3.4 Adjust pivot point accordingly.
1.3.5 Lock bearing insert in place with set
screw.
Walking
beam
Adjustment
screw
Pivot
pin
Pivot
screw
Position Stnd pin Extended pin
A 1/8” [3] 3/4” [19]
B 3/8” [10] 1” [25]
C 3/4” [19] 1-5/16” [33]
A
B
C
Pivot
Cover plate
Adjustment screw
Bearing insert
Pivot channel
Set screw
Adjustment
screw


Produktspezifikationen

Marke: Dormakaba
Kategorie: Schwelle
Modell: BTS75V

Brauchst du Hilfe?

Wenn Sie Hilfe mit Dormakaba BTS75V benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten