Da-Lite Designer Manual 76456MO Bedienungsanleitung

Da-Lite Projektionsleinwand Designer Manual 76456MO

Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Da-Lite Designer Manual 76456MO (4 Seiten) in der Kategorie Projektionsleinwand. Dieser Bedienungsanleitung war für 31 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/4
INSTRUCTION BOOK FOR
Designer Manual
2
For Wall Mounting
Hardware Provided
(2) V Bars ( one is factory mounted to the back of the case; one will be mounted to the wall)
(6) Toggle Bolts, 4"
(6) Lead Shields, #10-14 x 1-1/2"
(6) Phillips Flat Head Wood Screws, #10 x 2"
Tools Required
Electric Drill
Masonry Bit 5/16" (if mounting in solid masonry or concrete)
Screw Driver, #2 Flat Tip (if using toggle bolts)
or #2 Phillips (if mounting in solid masonry or concrete)
Mount Top Of
"V" Bar Flush
With Top Of Case
"V" Bar Mounted
To The Wall
"V" Bar Mounted To
The Back Of The Case
At The Factory
Wall
Floor Line
Ceiling
Allow A Minimum Of 1 ¼"
From The Ceiling
Determine
Measurement
To The Top Of
The Case
4"
4 ¼"
3
Installation Instructions Maintenance
Determine the height of the top of the case from the loor.
This will be the height of the wall mounted V bar.
Hold the loose V bar to the wall at the height determined above
(MAKE SURE IT IS LEVEL), and mark the location for the screw
holes. To mount theV bar on solid concrete or masonry wall,
drill 5/16" holes and insert the lead shields. Fasten the V bar to
the wall using the #10 x 2" wood screws. If you are mounting to a
hollow wall, drill 1/2" holes and insert the toggle bolts. Then fasten
the V bar to the wall with the toggle bolts. Now set the case in
place on the wall with theV bar of the case nestled into the
V bar on the wall.
For Ceiling Suspension
Position and properly anchor screw hooks into ceiling, beam
or other solid surface. Then proceed to use the twoD” rings
that are factory mounted to the top of the case to hang the
case securely.
To Lower And Raise Picture Surface
To lower the picture surface, pull the screen down all the way.
Then hesitate and allow the screen to retract very slowly until it
locks in place. To raise the picture surface pull down on the pull
bail, then raise quickly, as a window shade. Keep control of the
picture surface. Do not allow it to roll uncontrolled into the case
or damage to the screen is sure to result.
Projection Screen Maintenance
Protect your screen by keeping it rolled in its case when not
in use. Always examine both front and back of surface before
rerolling into case to make certain screen is free of dust, dirt
or other foreign matter. Use a very soft duster brush to gently
remove foreign particles.
Case Maintenance
The case of the screen has a Resistovarinish. Thisinish is
resistant against: water, alcohol, marring, scratching, and nail
polish remover. To help maintain the best appearance of the
case it is recommended that the case be polished with any
reputable liquid or paste wax polish. An oil type polish is not
recommended because it allows for the collection of dust and
inger prints. When necessary, this inish may be wiped with
a damp soft cloth using a mild soap solution, rinsed with
clear water and dried with a soft cloth.

Produktspezifikationen

Marke: Da-Lite
Kategorie: Projektionsleinwand
Modell: Designer Manual 76456MO

Brauchst du Hilfe?

Wenn Sie Hilfe mit Da-Lite Designer Manual 76456MO benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Projektionsleinwand Da-Lite

Bedienungsanleitung Projektionsleinwand

Neueste Bedienungsanleitung für -Kategorien-