CyberPower BPSE72V45ART2U Bedienungsanleitung
CyberPower
Akku
BPSE72V45ART2U
Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für CyberPower BPSE72V45ART2U (11 Seiten) in der Kategorie Akku. Dieser Bedienungsanleitung war für 18 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet
Seite 1/11
BPSE36V45A (72V45A)RT2U
User’s Manual
K01 C000049- -02
IMPORTANT SAFETY INSTRUCTIONS
This manual contains important instructions. Please read and follow all instructions carefully
during installation and operation of the unit. Read this manual thoroughly before attempting to
unpack, install, or operate the Battery modules.
CAUTION! The UPS unit must be connected to a grounded AC power outlet with fuse or circuit
breaker protection. The Battery modules grounded are through the UPS.
CAUTION! The battery can power hazardous components inside the unit, even when the AC
input power is disconnected.
CAUTION! To prevent the risk of fire or electric shock, install in a temperature and humidity
controlled indoor area, free of conductive contaminants. (Please see specifications for
acceptable temperature and humidity range).
CAUTION! (No User Serviceable Parts): Risk of electric shock, do not remove cover. No user
serviceable parts inside. Refer servicing to qualified service personnel.
CAUTION! (Non-Isolated Battery Supply): Risk of electric shock, battery circuit is not
isolated from AC power source; hazardous voltage may exist between battery terminals and
ground. Test before touching.
CAUTION! Wiring must be done by qualified personnel.
CAUTION! DO NOT USE WITH OR NEAR AQUARIUMS! To reduce the risk of fire, do not
use with or near aquariums. Condensation from the aquarium can come in contact with metal
electrical contacts and cause the machine to short out.
CAUTION! Do not dispose of batteries in fire as the battery may explode.
CAUTION! Do not open or mutilate the battery, released electrolyte is harmful to the skin and
eyes.
CAUTION! A battery can present a risk of electric shock and high short circuit current. The
following precaution should be observed when working on batteries.
1
1. Remove watches, rings or other metal objects.
2. Use tools with insulated handles.
CAUTION! Make sure everything is turned off and disconnected completely before conducting
any maintenance, repairs or shipment.
CAUTION! Connect the Protection Earth (PE) safety conductor before any other cables are
connected.
DO NOT INSTALL THE WHERE IT WOULD BE EXPOSED TO DIRECT SUNLIGHT OR UNIT
NEAR A STRONG HEAT SOURCE!
SERVICING OF BATTERIES SHOULD BE PERFORMED OR SUPERVISED BY PERSONNEL
KNOWLEDGE OF BATTERIES AND THE REQUIRED PRECAUTIONS. KEEP
UNAUTHORIZED PERSONNEL AWAY FROM BATTERIES!
UNPACKING
UNPACKING
The box should contain the following : items
Batteries Module
User’s manual
Battery Cable
rackmount ears ( 2 PCS )
Rackmount rails ( L & R )
Flat head screws: M4 8) X8L (
Pan head screws: M5X12L (12)
Plastic washers (8)
Screw hole dust covers (8)
2
BASIC OPERATION
FRONT/REAR PANEL DESCRIPTION
BPSE36V45A , BPSE72V45A RT2U RT2U
1. Input Connector
Use this input connector to daisy chain the next Battery module. Remove the connector cover for
access.
2 -. On board Replaceable Fuse Cover
Replaceable fuse is accessible from the rear panel. It must be done by qualified personnel.
3 Battery . Output Connector
Use this output Connector to connect the Battery module to the Power module or to the next
Battery module.
HARDWARE INSTALLATION
These batteries modules can be mounted in a rackmount or vertical tower orientation. This
versatility is especially important to growing organizations with changing needs that value having
the option to position a batteries module on a floor or in a rackmount system. Please follo w the
instructions below for the respective mounting methods.
SAFETY PRECAUTIONS
CAUTION! To prevent the risk of fire or electric shock, only use the supplied hardware to attach
the mounting brackets.
3
Produktspezifikationen
Marke: | CyberPower |
Kategorie: | Akku |
Modell: | BPSE72V45ART2U |
Brauchst du Hilfe?
Wenn Sie Hilfe mit CyberPower BPSE72V45ART2U benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Akku CyberPower
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
21 September 2024
21 September 2024
21 September 2024
21 September 2024
7 September 2024
Bedienungsanleitung Akku
- Akku Hama
- Akku Kensington
- Akku Nedis
- Akku Trust
- Akku Watson
- Akku Panasonic
- Akku LG
- Akku Bosch
- Akku Vonroc
- Akku Canon
- Akku Conrad
- Akku Cocraft
- Akku Ryobi
- Akku Skil
- Akku Carat
- Akku Hilti
- Akku DeWalt
- Akku Einhell
- Akku Worx
- Akku Fuxtec
- Akku Kress
- Akku Varta
- Akku Biltema
- Akku Epson
- Akku TOA
- Akku Tripp Lite
- Akku Ansmann
- Akku Petzl
- Akku Husqvarna
- Akku Scosche
- Akku Stihl
- Akku Genaray
- Akku Fujifilm
- Akku Nikon
- Akku DJI
- Akku Stiga
- Akku Leica
- Akku Greenworks
- Akku PNY
- Akku Xtorm
- Akku Techly
- Akku Vetus
- Akku Monacor
- Akku Milwaukee
- Akku Toolcraft
- Akku Victron Energy
- Akku Fein
- Akku EGO
- Akku Gardena
- Akku HQ
- Akku Cobra
- Akku Powerplus
- Akku Digitus
- Akku APC
- Akku McCulloch
- Akku Ozito
- Akku Deltaco
- Akku Speed-Link
- Akku Fluke
- Akku Hikvision
- Akku EnerGenie
- Akku Hähnel
- Akku Ultron
- Akku Cortina
- Akku Berg
- Akku Energizer
- Akku Neewer
- Akku Stinger
- Akku Sungrow
- Akku Growatt
- Akku Aluratek
- Akku Inovonics
- Akku SolarEdge
- Akku Arris
- Akku Duracell
- Akku Arctic Cooling
- Akku Wentronic
- Akku SOUNDBOKS
- Akku PowerBass
- Akku BlackVue
- Akku E-flite
- Akku For_Q
- Akku Bolt
- Akku Anton/Bauer
- Akku Anova
- Akku Lenmar
- Akku Verico
- Akku APSystems
- Akku Enphase
- Akku A-solar
- Akku Valcom
- Akku Impact
- Akku Team Orion
- Akku Red Power
- Akku Whistler
- Akku PowerDrive
- Akku Fxlion
- Akku TCW Technologies
- Akku Tecnoware
- Akku Ventev
Neueste Bedienungsanleitung für -Kategorien-
8 Oktober 2024
6 Oktober 2024
Arris SURFboard Touchstone Battery BPB022S Bedienungsanleitung
29 September 2024
16 September 2024
15 September 2024
14 September 2024
8 September 2024
6 September 2024
6 September 2024
6 September 2024