CyberPower BPSE240V75ART3UOA Bedienungsanleitung
CyberPower
Accu
BPSE240V75ART3UOA
Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für CyberPower BPSE240V75ART3UOA (16 Seiten) in der Kategorie Accu. Dieser Bedienungsanleitung war für 4 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet
Seite 1/16
User s Manual
ˊ
ˊ
ˊ
ˊˊ
BPSE240V75ART3U
BPSE240V75ART3U OA
CyberPower Systems Inc.
www.cyberpower.com
K01-C000117-02
CONTENT:
1. SAFETY ............................................................................................................1
2. UNPACKING 3.....................................................................................................
3. BASIC OPERATION .........................................................................................4
3.1. SCHEMATIC .............................................................................................4
3.2. FRONT/REAR PANEL DESCRIPTION .....................................................4
4. HARDWARE INSTALLATION ..........................................................................5
4.1. RACKMOUNT INSTALLATION .................................................................5
4.2. VERTICAL/TOWER INSTALLATION ........................................................8
5. ELECTRICAL INSTALLATION ...................................................................... 10
5.1. One Battery module with 240Vdc input of the Power module ..................10
5.2. Multiple Battery modules with 240Vdc input of the Power module .......... 11
5.3. Two Battery modules with ±240Vdc input of the Power module .............. 13
5.4. Multiple Battery modules with ±240Vdc input of the Power module ........ 13
6. TECHNICAL SPECIFICATION ....................................................................... 14
1
1. SAFETY
This manual contains important instructions. Please read and follow all instructions
carefully during installation and operation of the unit. Read this manual thoroughly
before attempting to unpack, install, or operate the Battery module.
The UPS unit must be connected to a grounded AC power outlet CAUTION!
with fuse or circuit breaker protection. The Battery modules grounded are
through the UPS.
The battery can power hazardous components inside the unit, CAUTION!
even when the AC input power is disconnected.
To prevent the risk of re or electric shock, install in a CAUTION!
temperature and humidity controlled indoor area, free of conductive
contaminants. (Please see specications for acceptable temperature and
humidity range).
Risk of electric shock, do not CAUTION! (No User Serviceable Parts):
remove cover. No user serviceable parts inside. Refer servicing to qualied
service personnel.
Risk of electric shock, battery CAUTION! (Non-Isolated Battery Supply):
circuit is not isolated from AC power source; hazardous voltage may exist
between battery terminals and ground. Test before touching.
Wiring must be done by qualied personnel.CAUTION!
To reduce the CAUTION! DO NOT USE WITH OR NEAR AQUARIUMS!
risk of re, do not use with or near aquariums. Condensation from the
aquarium can come in contact with metal electrical contacts and cause the
machine to short out.
Do not dispose of batteries in re as the battery may explode. CAUTION!
Do not open or mutilate the battery, released electrolyte iCAUTION! s
harmful to the skin and eyes.
A battery can present a risk of electric shock and high short CAUTION!
circuit current. The following precaution should be observed when working on
batteries
1. Remove watches, rings or other metal objects.
2. Use tools with insulated handles.
Make sure everything is turned o and disconnected completely CAUTION!
Produktspezifikationen
Marke: | CyberPower |
Kategorie: | Accu |
Modell: | BPSE240V75ART3UOA |
Brauchst du Hilfe?
Wenn Sie Hilfe mit CyberPower BPSE240V75ART3UOA benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Accu CyberPower
24 September 2024
24 September 2024
24 September 2024
24 September 2024
24 September 2024
21 September 2024
21 September 2024
21 September 2024
21 September 2024
7 September 2024
Bedienungsanleitung Accu
- Accu Hama
- Accu Kensington
- Accu Watson
- Accu Panasonic
- Accu LG
- Accu Bosch
- Accu Vonroc
- Accu Canon
- Accu Conrad
- Accu Ryobi
- Accu Skil
- Accu Carat
- Accu Hilti
- Accu DeWalt
- Accu Einhell
- Accu Fuxtec
- Accu Kress
- Accu Varta
- Accu Biltema
- Accu TOA
- Accu Tripp Lite
- Accu Husqvarna
- Accu Scosche
- Accu Stihl
- Accu Genaray
- Accu Fujifilm
- Accu Nikon
- Accu DJI
- Accu Stiga
- Accu Leica
- Accu Greenworks
- Accu PNY
- Accu Xtorm
- Accu Techly
- Accu Vetus
- Accu Monacor
- Accu Milwaukee
- Accu Toolcraft
- Accu EGO
- Accu Gardena
- Accu HQ
- Accu Cobra
- Accu Powerplus
- Accu APC
- Accu Ozito
- Accu Deltaco
- Accu Fluke
- Accu Hikvision
- Accu EnerGenie
- Accu Hähnel
- Accu Ultron
- Accu Cortina
- Accu Berg
- Accu Energizer
- Accu Neewer
- Accu Stinger
- Accu Growatt
- Accu SolarEdge
- Accu Arris
- Accu Duracell
- Accu Arctic Cooling
- Accu Wentronic
- Accu SOUNDBOKS
- Accu Bolt
- Accu Anton/Bauer
- Accu Anova
- Accu Lenmar
- Accu Verico
- Accu APSystems
- Accu Enphase
- Accu A-solar
- Accu Valcom
- Accu Impact
- Accu Team Orion
- Accu PowerDrive
- Accu TCW Technologies
- Accu Tecnoware
- Accu Ventev
Neueste Bedienungsanleitung für -Kategorien-
Arris SURFboard Touchstone Battery BPB022S Bedienungsanleitung
29 September 2024
16 September 2024
15 September 2024
14 September 2024
8 September 2024
6 September 2024
6 September 2024
6 September 2024
6 September 2024
6 September 2024