Zempire Neo 6 Bedienungsanleitung

Zempire Zelt Neo 6

Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Zempire Neo 6 (4 Seiten) in der Kategorie Zelt. Dieser Bedienungsanleitung war für 19 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/4
PITCHING INSTRUCTIONS - NEO 6
6. Peg out all the peg points around
the inner tent. The peg points at the
base of each pole should be pegged
through the webbing loop rather than
the ring.
2x
2x
4. Thread the BLUE poles
through the pole sleeves on
either side of the dome you
have just created. Insert the
pole ends into rings. Clip the
C clips around the poles.
8. Attach the elastic loop over
the existing inner pegs. Where
there is no existing peg, peg the
fly directly into the ground
ensuring there is significant space
between the inner and fly.
9. It is recommended that guy
ropes are pegged out at all
times and windows are opened
whenever possible to allow
adequate ventilation.
Insert pegs at a 45o angle
3. Thread the RED poles
through the pole sleeves that
run diagonally across the
centre of the tent. Insert the
ends of the poles into the pins
located below each pole
sleeve. Clip the C clips around
the poles
1. Clear your site making sure there are no
sharp objects where you are going to
pitch your tent. Try to get a site that is as
flat as possible. Spread out the inner tent
(White), the main door is located at the
front.
2. Assemble the 5 pole sections.
Ensure that the poles do not
snap together.
1x
NEO
6
7. Pull the fly over the inner tent.
The webbing loops ORANGE
indicate the front of the fly.
Connect the velcro loops inside
the fly around the cut outs on the
corresponding pole sleeve.
5. Thread the GREEN poles
through the pole sleeve at the
front of the tent. Insert the pole
ends into rings.
Copyright 2014
pitching instructions
NEO6
Freedom Zempire is proud to be a 100%
New Zealand owned and operated
business.
For more information about this and
other great products we offer please
visit our website.
WWW.FREEDOMCAMPING.COM
PITCHING INSTRUCTIONS - NEO 6
1. Ensure guy ropes are pegged out at all times during use
2. Never pack your tent away wet. If you must take your tent down when
wet, ensure that you dry you tent completely as soon as possible to
prevent mildew forming.
3. If mildew does form on your tent wash off pours with warm water and a
soft brush to prevent further growth. Do not use detergents.
4. Do not use an open flame inside your tent. The fabric has been treated
with a fire retardant but is in no way fire proof
5. Clean all pegs and poles before storing
.


Produktspezifikationen

Marke: Zempire
Kategorie: Zelt
Modell: Neo 6

Brauchst du Hilfe?

Wenn Sie Hilfe mit Zempire Neo 6 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Zelt Zempire

Bedienungsanleitung Zelt

Neueste Bedienungsanleitung für -Kategorien-