Zempire Aerodome I plus Bedienungsanleitung

Zempire Zelt Aerodome I plus

Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Zempire Aerodome I plus (2 Seiten) in der Kategorie Zelt. Dieser Bedienungsanleitung war für 8 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/2
IN THE UNLIKELY EVENT OF YOUR TENT DEVELOPING A LEAK
2. Firstly check all valves are screwed in correctly.
3. Deflate the faulty Air Pole and unzip the flysheet sleeve.
4. Remove the tube from the Outer by cutting the cable tie holding
the zipper ends together and unzip.
CAUTION: DO TO OPEN THESE ZIPS WHEN THE POLE IS INFLATED.
5. Remove the clear tube from the Sleeve.
6. Partially inflate the tube and check for leaks (bubbles) in a basin of water.
7. Using a the repair patch provided cover the hole and seal.
8. Partially inflate the tube and re insert into the pole sleeve. Zip together.
9. Connect the zipper ends with the replacement Cable ties provided.
INNER TENT ATTACHMENT
1. Lay out the inner inside the tent with the
door facing the centre and the black floor
facing downwards.
2. Attach the buckles at the rear corners of
the tent and connect the toggles on the
inner through the corresponding rings
working your way from the rear to the
front.
3. The room can remain attached when
deflating the tent. Side Release
Buckles
INSTRUCTIONS
13. It is recommended that guy ropes are pegged
out at all times and windows are opened
whenever possible to allow adequate ventilation.
Insert pegs at a 45o angle
3. Unzip the triangle Valve Cover on
the right hand side of the tent and
locate the AERO-FRAME valves.
1. Clear your site making sure there are no sharp
objects where you are going to pitch your tent. Try
WRJHWDVLWHWKDWLVDVƮDWDVSRVVLEOH6SUHDGWHQW
out, the PVC windows are located at the front.
2. Peg out the 4 peg points on the main body of the
tent as shown.
4. Remove the valves completely and re-screw in to ensure the valve is not
FURVVWKUHDGHG6FUHZLQƬUPO\EXWGRQRWRYHUWLJKWHQ2SHQWKHYDOYHFDSV
5. The pump features a double hose adapter
ZKLFKDOORZVWZRWXEHVWREHLQƮDWHGDWWKH
same time.
(QVXUHWKHSXPSLVFRQƬJXUHGDVSHUWKH
following diagram.
Attach the of the hoses to the AERO-FRAME
valve inlets.
6. %HJLQWRLQƮDWHWKHFHQWUHDQGUHDUAERO-FRAME. Have
VRPHRQHZDONLQVLGHWRKHOSUDLVHWKHIUDPHGXULQJLQƮDWLRQ
,QƮDWHWR36,
DO NOT INFLATE ABOVE 8PSI. THIS MAY CAUSE DAMAGE TO
THE POLES AND THE TENT.
7. 2QFHLQƮDWHGWRWKHFRUUHFWSUHVVXUHUHPRYHWKHSXPSKRVHVDQGVHFXUHO\DWWDFK
the valve caps. Close the Valve Cover.
8. Remove the double adapter and attach
one hose directly to the pressure gauge as
shown.
9.,QƮDWHWKHIURQWDZQLQJ
AERO-FRAME following the
previous procedure, then remove
the hose and securely attach the
valve cap.
10. Peg out the remaining peg points around
WKHWHQWHQVXULQJWKDWWKHƮRRUVLWVƮDW,WLV
easier to align the front door correctly with
the door closed.
11. Peg out the front and rear anchor
webbings. These should sit at a 45o angle to the
ground.
DEFLATION
1. AERO-FRAME.Remove the valves from the Take care as poles will be under
pressure.
2. AERO-FRAME It may be necessary to remove some excess air from the
before rolling up your tent. This can be done by carefully walking down the
length of the tube towards the valve end.
PSI0
1
2
3
4 5 6
7
8
9
10
INFL AT E
DEFL AT E
12. Peg out the 2 draft vents on either side of
the bedrooms. These can be pegged closed
during cooler weather conditions.


Produktspezifikationen

Marke: Zempire
Kategorie: Zelt
Modell: Aerodome I plus

Brauchst du Hilfe?

Wenn Sie Hilfe mit Zempire Aerodome I plus benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Zelt Zempire

Bedienungsanleitung Zelt

Neueste Bedienungsanleitung für -Kategorien-