Vokèra Mynute 24SE Bedienungsanleitung


Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Vokèra Mynute 24SE (40 Seiten) in der Kategorie Zentralheizungskessel. Dieser Bedienungsanleitung war für 34 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/40
Users Instructions
Installation &
Servicing
Instructions
THESE INSTRUCTIONS
TO BE RETAINED
BY USER
Vokèra is a licensed member of the Benchmark scheme
which aims to improve the standards of installation and
commissioning of systems in the UK.
Mynute 24 SE
Standard efficiency system boiler
“GC No. 41-094-73”
Users instructions
Things you should know Page
1.1 Gas appliances 1
1.2 Electrical supply 1
1.3 Guarantee registration card 1
1.4 Appliance Log Book (UK only) 1
1.5 How does it work? 1
1.6 Dimensions 1
1.7 Clearances required 1
1.8 Frost protection system 1
1.9 Appliance status indicators 1
Getting started Page
2.1 Before switching ON 3
2.2 Appliance controls 3
2.3 Lighting the boiler 3
2.4 Adjusting the heating temperature 3
2.5 Explanation of features 3
2.6 Automatic temperature control 3
How to... Page
3.1 How to top-up the system pressure 3
3.2 How to reset the appliance 3
3.3 How to shut down the system for short periods 3
3.4 How to shut down the system for long periods 3
3.5 How to care for the appliance 3
What if... Page
4.1 What if I suspect a gas leak 4
4.2 What if I have frequently top-up the system 4
4.3 What if the appliance is due its annual service 4
4.4 What if I need to call an engineer 4
Installation and Servicing instructions
Design principles & operating sequence Page
1.1 Principle components 6
1.2 Mode of operation (at rest) 6
1.3 Mode of operation (heating) 6
1.4 Safety devices 6
Technical data Page
2.1 Central heating 7
2.2 Gas pressures 7
2.3 Expansion vessel 7
2.4 Dimensions 7
2.5 Clearances 7
2.6 Connections 7
2.7 Electrical 7
2.8 Flue details (concentric) 7
2.9 Flue details (twin pipes) 7
2.10 Efficiency 7
2.11 Emissions 7
2.12 Pump duty 8
General requirements (UK) Page
3.1 Related documents 9
3.2 Location of appliance 9
3.3 Gas supply 9
3.4 Flue system 9
3.5 Air supply 9
3.6 Water circulation 9
3.7 Electrical supply 10
3.8 Mounting on a combustible surface 10
3.9 Timber framed buildings 10
3.10 Inhibitors 10
General requirements (EIRE) Page
3A.1 Related documents 10
3A.2 Location of appliance 10
3A.3 Gas supply 10
3A.4 Flue system 10
3A.5 Air supply 11
3A.6 Water circulation 11
3A.7 Electrical supply 11
3A.8 Mounting on a combustible surface 11
3A.9 Timber framed buildings 11
3A.10 Inhibitors 11
3A.11 Declaration of conformity 11
Installation Page
4.1 Delivery 12
4.2 Contents 12
4.3 Unpacking 12
4.4 Preparation for mounting the appliance 12
4.5 Fitting the flue 12
4.6 Connecting the gas & water 15
4.7 Electrical connections 16
Commissioning Page
5.1 Gas supply installation 17
5.2 The heating system 17
5.3 Initial filling of the system 17
5.4 Initial flushing of the system 17
5.5 Pre-operation checks 17
5.6 Initial lighting 17
5.7 Checking gas pressure & combustion analysis 17
5.8 Final flushing of the heating system 17
5.9 Setting the boiler operating temperature 17
5.10 Setting the system design pressure 17
5.11 Regulating the central heating system 17
5.12 Final checks 17
5.13 Instructing the user 18
Servicing Page
6.1 General 18
6.2 Routine annual servicing 18
6.3 Replacement of components 18
6.4 Component removal procedure 18
6.5 Pump assembly 19
6.6 Safety valve 19
6.7 Lower automatic air release valves 19
6.8 Water pressure switch 19
6.9 Flow thermistor 19
6.10 Printed circuit board 19
6.11 Gas valve 20
6.12 Burner 20
6.13 Main heat exchanger 20
6.14 Automatic by-pass 21
6.15 Expansion vessel removal 21
Checks, adjustments and fault finding Page
7.1 Checking appliance operation 22
7.2 Appliance modes of operation 22
7.3 Adjustments 22
7.4 Combustion analysis test 24
7.5 Checking the expansion vessel 24
7.6 External faults 24
7.7 Electrical checks 24
7.8 Fault finding 25
7.9 Component values & characteristics 25
Wiring diagrams Page
8.1 External wiring 26
8.2 Typical control applications 26
8.3 Other devices 26
Exploded diagrams Page
9.1 Table 1 28
9.2 Table 2 29
9.3 Table 3 30
9.4 Table 4 31
9.5 Table 5 32
L.P.G. instructions Page
10.1 Related documents 33
10.2 Technical data 33
10.3 Converting the appliance gas type 33
Benchmark 34-35
1
USERS INSTRUCTIONS
1.1 GAS APPLIANCES
Gas Safety (Installations and Use) Regulations (UK).
In the interests of your safety and that of others it is a legal
requirement that all gas appliances are installed and correctly
maintained by a competent person and in accordance with the
latest regulations.
1.2 ELECTRICAL SUPPLY
Please ensure that this appliance has been properly con-
nected to the electrical supply by means of a double pole
isolator or un-switched socket, and that the correct size of fuse
(3 AMP) has been fitted.
Warning: this appliance must be earthed!
1.3 GUARANTEE REGISTRATION CARD
Please take the time to fill out your guarantee registration card.
The completed warranty card should be posted within 30 days
of installation.
1.4 APPLIANCE LOG BOOK (UK only)
A logbook section can be found at the rear of the appliance
installation booklet. This important document must be completed
during the installation/commissioning of your boiler. All GAS
SAFE registered installers carry a GAS SAFE ID card, and have
a registration number. These details should be recorded in the
Benchmark logbook section within the installation booklet. You
can check your installers details by calling GAS SAFE direct on
08004085500. Failure to install and commission the appliance
in accordance with the manufacturers instructions may
invalidate the warranty. This does not affect your statutory
rights.
1.5 HOW DOES IT WORK?
Your Mynute SE boiler supplies heated water to your radiators
and hot water to your hot water tank.
The central heating is controlled via a time clock and any
thermostats that your installer may have fitted. The boiler will
light when it receives a request from the time clock via any
thermostat that may be installed, or whenever a hot water outlet
(tap) is opened.
Your Mynute SE boiler lights electronically and does not have
a pilot light.
In the unlikely event of a fault developing with your boiler, the
supply of gas to the burner will be terminated automatically.
Dear Customer
Your Vokèra Mynute SE boiler has been designed to meet and exceed the very latest standards in gas central heating
technology, and if cared for, will give years of reliable use and efficiency.
Please therefore take some time to read these instructions carefully.
Do’s and Don’t’s
-Do ensure that the system pressure is periodically checked
-Do ensure that the boiler should not be used by children or unassisted disabled people
-Do ensure that you know how to isolate the appliance in an emergency
-Do ensure that you are familiar with the appliance controls
-Do ensure that your installer has completed the appliance log book section
-Do not attempt to remove the appliance casing or gain internal access
-Do not hang clothes etc. over the appliance
-Do not forget to have the appliance serviced annually.
This booklet is an integral part of the appliance. It is therefore necessary to ensure that the booklet is handed to the person
responsible for the property in which the appliance is located/installed. A replacement copy can be obtained from Vokèra
customer services.
INTRODUCTION
1.6 DIMENSIONS
1.7 CLEARANCES REQUIRED
ABOVE 150 mm
BELOW 150 mm
LEFT SIDE 50 mm
RIGHT SIDE 50 mm
FRONT 600 mm
Mynute 24 SE
HEIGHT 715 mm
WIDTH 405 mm
DEPTH 248 mm
1.8 FROST PROTECTION SYSTEM
The Mynute SE is equipped with a built-in frost protection
system, this enables the boiler to over-ride the time controls –
even if switched off and operate the burner and/or pump,
should the temperature drop below 5 0C. In particular the burner
will be in ON status until the main temperature reaches 35°C
for CH appliance.
Please note that the frost protection system is designed to
protect the appliance only, should frost protection be required
for the heating system, additional controls may be required.
NOTE
The frost protection system is reliant on the appliance having
a permanent electrical supply, and being in a non-fault
condition.
1.9 APPLIANCE STATUS INDICATORS
Your boiler is equipped with 2 status LED indicators, the Green
LED indicates that the flame is present, the Red LED indicates
the appliance has detected a fault.
1. THINGS YOU SHOULD KNOW


Produktspezifikationen

Marke: Vokèra
Kategorie: Zentralheizungskessel
Modell: Mynute 24SE

Brauchst du Hilfe?

Wenn Sie Hilfe mit Vokèra Mynute 24SE benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Zentralheizungskessel Vokèra

Bedienungsanleitung Zentralheizungskessel

Neueste Bedienungsanleitung für -Kategorien-