Vemer PC1R Micro Bedienungsanleitung


Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Vemer PC1R Micro (1 Seiten) in der Kategorie Nicht kategorisiert. Dieser Bedienungsanleitung war für 12 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/1
Electronic instrument to measure the consumption of active power in single-
phase systems to prevent the activation of the limiter switch of general current
for overload.
PC1R Micro provides for the disconnection of a not priority load if the
consumption of measured power is higher than the prefixed threshold (setpoint)
continuously for a time of settable pre-alarm (Ton). The connection of the load
occurs after a disconnection time (Toff).
Code Model Description
VE788800 PC1R Micro Single-phase load control relay 1 relay
SAFETY WARNINGS
During the installation and the operation of the instrument it’s necessary to
observe the following instructions:
1) The instrument must be installed by a qualified person by observing
scrupulously the connection diagrams.
2) The instrument must be installed and activated in compliance with current
electric systems standards.
3) After installation, inaccessibility to the connection terminals without appropriate
tools must be granted.
4) Do not use the instrument for other purposes different from the one specified.
5) The instrument must be installed in a closed electrical panel adequately
protected.
6) In the power supply network a bipolar disconnection must be present.
7) A protection device against over-currents should be installed in the electrical
system, upstream of the device.
8) Before accessing the connection terminals, verify that the leads are not live.
9) Do not power on or connect the instrument if any part of it is damaged.
10) The instrument can be used in environments with overvoltage category III
and pollution degree 2, according to the CEI EN 61010-1 standard.
TECHNICAL CHARACTERISTICS
Power supply: 230Vac (-15% ÷ +10%) 50/60 Hz
Consumption: 1 W (12 VA) at 230 Vac
Current insertion up to 65 A via current transformer (CT)
Maximum diameter of the conductor through the TA: 10 mm
Settable setpoint range: 1 ÷ 8 kW
Pre-alarm time range Ton: 30 s ÷ 15 min
Disconnection time range Toff: 30 s ÷ 15 min
Output: 1 relay NO 16A / 250Vac
Blocks for cables with maximum section of 4 mm
2
Operating temperature: -10°C ÷ +45°C
Operating humidity: 10% ÷ 90% non condensing
Storage temperature: -10°C ÷ +65°C
Container: 1 module DIN
Protection degree: IP20 / IP40 (on the front panel)
Insulation: reinforced between accessible parts (front panel) and all other terminals
Type of actions: 1B
Ton Toff
1 2 1 2 12 1 2
Time
Power
Setpoint
disconnection load
OPERATION LOGIC
REFERENCE STANDARDS
Compliance with Community Directives: 2014/35/EU (LVD) and 2014/30/EU (EMCD)
is declared with reference to the following Standards:
• EN 61010-1 • EN 61000-6-2 and 61000-6-3
information to users pursuant to art. 14 of the directive
2012/19 / EU of the european parliament and of the council
of 4 july 2012 on waste electrical and electronic equipment (WEEE)
If the crossed-out bin symbol appears on the equipment or packaging,
this means the product must not be included with other general
waste at the end of its working life.
The user must take the worn product to a sorted waste center,
or return it to the retailer when purchasing a new one.
Products for disposal can be consigned free of charge (without any new purchase obligation)
to retailers with a sales area of at least 400 m
2, if they measure less than 25 cm.
An efficient sorted waste collection for the environmentally friendly disposal of the used device
or its subsequent recycling, helps avoid the potential negative effects on the environment
and people’s health, and encourages the re-use and/or
recycling of the construction materials.
5OPERATION
1User Manual
LOADS CONTROL 1 RELAY
Read all the instructions carefully
To prevent the disconnection of all loads downstream of the general counter, the
loads control PC1R Micro must measure the same current of the energy meter.
For this reason the ideal position for the connection of the instrument is immediately
downstream of the general switch.
Two loads or groups of loads must be located and so divided:
not disconnectable loads, that is to say loads which can’t be disconnected
and that can’t be controlled by PC1R Micro (even if their consumption must be
measured by PC1R Micro to determine the total consumption)
, which can be disconnected if the absorbed power is disconnectable loads
higher than the prefixed threshold.
Note: PC1R Micro can be used also as a generic controller of absorbed power by
loads under control by placing it upstream of the cable for power supply of loads
themselves.
Clearly with this second application its not possible to prevent the disconnection
of the general energy meter, because the absorptions of the loads not controlled by
PC1R Micro are not counted.
4INSTALLATION
Relay terminals
Terminals for power supply
Power input terminals
Green led: power supply presence
Red led: on indicates disconnected load
Adjustment trimmer
3INSTRUMENT DESCRIPTION
DIMENSIONS
218 65
91
Vemer S.p.A.
I - 32032 Feltre (BL) • Via Camp Lonc, 16
e-mail: info@vemer.it - web site: www.vemer.it
V3IS01076-010
Mod. PC1R Micro
DEACTIVATION OF THE CONTROL
It is possible to disable relay switching which normally occurs when the intervention
threshold is exceeded.
To enable this function, regulate the pre-alarm trimmer to the maximumTon
value and verify that the green LED flashes.
To restore normal operation, reset the trimmer to the desired value (and inTon
any case lower than the maximum value) and checking that the green LED is
steady on.
DEFINITION AND MODIFICATION OF OPERATION PARAMETERS
[kW] represents the activation threshold that is to say the maximum Setpoint
value of accepted consumption. Over this value the instrument provides for the
disconnection of the load.
Ton [seconds] represents the pre-alarm time, that is to say how long the power
must be higher than the setpoint before the load is actually disconnected.
During the pre-alarm time the red LED flashes.
Toff [seconds] represents the disconnection time, that is to say after how long
the load is reconnected.
During the disconnection time the red LED is on.
Note: the load is connected only if the absorbed power is lower than the Setpoint.
It is not necessary
to respect a particular verse of
the current through the CT.
07-2022
Priority
load
Non
Priority
load


Produktspezifikationen

Marke: Vemer
Kategorie: Nicht kategorisiert
Modell: PC1R Micro

Brauchst du Hilfe?

Wenn Sie Hilfe mit Vemer PC1R Micro benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Nicht kategorisiert Vemer

Bedienungsanleitung Nicht kategorisiert

Neueste Bedienungsanleitung für -Kategorien-