Gossen Metrawatt PROFITEST MTECH plus Bedienungsanleitung

Gossen Metrawatt Messgeräte PROFITEST MTECH plus

Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Gossen Metrawatt PROFITEST MTECH plus (96 Seiten) in der Kategorie Messgeräte. Dieser Bedienungsanleitung war für 13 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/96
Operating Instructions
3-349-647-03
11/11.14
Series PROFITESTMASTER
PROFITESTMBASE+, MTECH+, MPRO, MXTRA, SECULIFEIP
Test Instruments for DIN VDE 0100
2GMC-I Messtechnik GmbH
456
8
91011
7
MEM:Key for memory functions
HELP: Access context sensitive help
IN: Tripping test
Proceeding to next function
(semi-automatic measurement)
Start offset measurements
ON/START
: Switch instrument on,
start/stop measurement
ESC:Return to submenu
13
31
Softkeys
Control Panel
Test Instrument and Adapter
16 1715
14
Fixed Function Keys
2
19 20 21
22
12
!
RS 232
2
Parameter selection
Specify limit value
Entry functions
Memory functions
LEDs and connection icons
section 18
9
10
Sockets for Current Clamp Sensor, Probe and
PRO-AB Leakage Current Adapter
15
16
17
Interfaces, Charger Jack
* Refer to section 2.1 page 5 regarding usage of
the test probes.
*
**
18
GMC-I Messtechnik GmbH 3
Key
Overview of Device Settings and Measuring Functions
1) nur MXTRA & SECULIFE IP 2) nur MXTRA 3) nur MTECH+ & MXTRA
Test Instrument and Adapter
1 Control panel with keys and
display panel with detent for
ideal viewing angle
2 Eyelets for attaching the
shoulder strap
3 Rotary selector switch
4 Measuring adapter (2-pole)
5 Plug insert (country specific)
6 Test plug (with retainer ring)
7 Alligator clip (plug-on)
8 Test probes
9t key ON/START *
10 I key IN/compens./ZOFFSET
11 Contact surfaces for finger
contact
12 Test plug holder
13 Fuses
14 Holder for test probes (8)
Connections for Current Clamp,
Probe and PRO-AB Adapter
15 Current clamp connection 1
16 Current clamp connection 2
17 Probe connection
Interfaces, Charger Jack
18 Bluetooth®
19 USB slave for PC connection
20 RS 232 for connecting barcode
scanner or RFID reader
21 Jack for Z502P charger
Attention! Make sure that no
batteries are inserted before
connecting the charger.
22 Battery Compartment Lid
(compartment for batteries
and replacement fuses)
Please refer to section 17 for
explanations regarding control
and display elements.
Battery level indicator
Meas. function
Meas. in progress / Memory occupancy
Measured
Parameter
Display Panel
PE
Save value
Battery full
Battery OK
Battery weak
Battery (nearly)
Battery level indicator
BAT
BAT
BAT
BAT
Memory occupancy display
MEM Memory half full
MEM Memory full > transfer data to PC
Connection Test – Mains Connection Test ( section 18)
N
PE
LN
PE
L)(
Connection OK L and N reversed
N
PE
L N
PE
L
x
N
PE
L N
PE
L
xx
RUN READY
Connection test section 18
depleted: U < 8 V
L
PE
N
x
L
PE
N
These operating instructions describe a tester with
software version SW-VERSION (SW1) 01.15.00
* Can only be switched on with the key on the instrument
Bluetooth
®
active:
quantities
stopped
Switch
Setting,
Descr. on
Picto-
graph
Device Settings
Measuring Functions
SETUP
page 8
Brightness, contrast, time/date, Bluetooth®
Language (D, GB, P), profiles (ETC, PS3, PC.doc)
Default settings
< Test: LED, LCD, acoustic signal
Rotary switch balancing,
battery test >
Measurements with line voltage
U
page 16
Single-phase measurement UL-N-PE
UL-N Voltage between L and N
UL-PE Voltage between L and PE
UN-PE Voltage between N and PE
US-PE Voltage between probe and PE
fFrequency
3-phase measurement U3~
UL3-L1 Voltage between L3 and L1
UL1-L2 Voltage between L1 and L2
UL2-L3 Voltage between L2 and L3
fFrequency
Phase sequence
Appears for all meas.
shown below:
U / UNLine voltage / nominal line voltage
f / fNLine frequency / nominal line frequency
IN
page 18
UIN Contact voltage
ta Tripping time
RE Earth resistance
IF
page 20
UIN Contact voltage
IResidual current
RE Earth resistance
ZL-PE
page 26
ZL-PE Loop impedance
IK Short-circuit current
ZL-N
page 28
ZL-N Line impedance
IK Short-circuit current
RE
page 30
2-pole measurement (ground loop) RE(L-PE)
2-pole measurement with country spec. plug
3-pole measurement (2-pole with probe)
Selective meas. with current clamp sensor
UE Earth electrode voltage (probe/clamp)
Measurements at voltage-free objects
RE
(MPRO)
(MXTRA)
page 37
3-pole measurement
4-pole measurement
Selective measurement with current clamp sensor
2-clamp measurement (earth loop res.)
Soil resistivity E
RLO
page 47
RLO Low-resistance with polarity reversal
RLO+, RLO– Low-resistance, single-pole
Roffset Offset resistance
RISO
page 44
RISO Insulation resistance
RE(ISO) Earth leakage resistance
U Voltage at the test probes
UISO Test voltage
Ramp: triggering/breakdown voltage
SENSOR
page 50
IL/AMP Residual or leakage current
T/RF Temperature/humidity (in preparation)
EXTRA
page 51
U Voltage drop measurement
ZST Standing surface insulation impedance
kWh test Meter start-up test, earth contact plug
IL 1
Leakage current meas. with Z502S adapter
IMD 2Check insulation monitoring device
Ures 2Residual voltage test
ta + I 2Intelligent ramp
RCM 2RCM (residual current monitor)
e-mobility 3
Electric vehicles at charging stations (IEC 61851)
PRCD 2Testing of PRCDs type S and K
AUTO
page 64
Automatic test sequences


Produktspezifikationen

Marke: Gossen Metrawatt
Kategorie: Messgeräte
Modell: PROFITEST MTECH plus

Brauchst du Hilfe?

Wenn Sie Hilfe mit Gossen Metrawatt PROFITEST MTECH plus benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Messgeräte Gossen Metrawatt

Bedienungsanleitung Messgeräte

Neueste Bedienungsanleitung für -Kategorien-