Bunn TB3 Bedienungsanleitung


Lesen Sie kostenlos die šŸ“– deutsche Bedienungsanleitung fĆ¼r Bunn TB3 (11 Seiten) in der Kategorie Theemaker. Dieser Bedienungsanleitung war fĆ¼r 2 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/11
TB3
TB3-LP
OPERATING & SERVICE MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
37235.0000D 05/06 Ā©2004 Bunn-O-Matic Corporation www.bunn.com
Page 2
CONTENTS
Introduction .....................................................................2
Warranty ..........................................................................2
User Notices .....................................................................3
Electrical & Plumbing Requirements ...............................4
Initial Set-Up ....................................................................5
Adjusting Brew Volumes ..................................................6
Auto Sweetener Set-up ....................................................6
Operating Controls ...........................................................7
Cleaning ...........................................................................8
Auto Sweetener Cleaning .................................................8
Tea Brewing ......................................................................8
Troubleshooting ...............................................................9
Service ...........................................................................15
Wiring Diagrams ............................................................28
INTRODUCTION
This equipment will brew a three-gallon batch of fresh tea into an awaiting dispenser. The tea will be dispensed at
approximately room temperature to conserve ice. The brewer is only for indoor use on a sturdy counter or shelf.
BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY
Bunn-O-Matic Corp. (ā€œBUNNā€) warrants equipment manufactured by it as follows:
1) All equipment other than as speciļ¬ ed below: 2 years parts and 1 year labor.
2) Electronic circuit and/or control boards: parts and labor for 3 years.
3) Compressors on refrigeration equipment: 5 years parts and 1 year labor.
4) Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis: parts and
labor for 3 years or 30,000 pounds of coffee, whichever comes ļ¬ rst.
These warranty periods run from the date of installation BUNN warrants that the equipment manufactured by it will be
commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the
applicable warranty period. This warranty does not apply to any equipment, component or part that was not manufactured
by BUNN or that, in BUNNā€™s judgment, has been affected by misuse, neglect, alteration, improper installation or operation,
improper maintenance or repair, damage or casualty. This warranty is conditioned on the Buyer 1) giving BUNN prompt
notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Ofļ¬ ce Box 3227,
Springļ¬ eld, Illinois 62708-3227; 2) if requested by BUNN, shipping the defective equipment prepaid to an authorized BUNN
service location; and 3) receiving prior authorization from BUNN that the defective equipment is under warranty.
THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EXPRESS
OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS
FOR A PARTICULAR PURPOSE. The agents, dealers or employees of BUNN are not authorized to make modiļ¬ cations to
this warranty or to make additional warranties that are binding on BUNN. Accordingly, statements by such individuals,
whether oral or written, do not constitute warranties and should not be relied upon.
If BUNN determines in its sole discretion that the equipment does not conform to the warranty, BUNN, at its exclusive
option while the equipment is under warranty, shall either 1) provide at no charge replacement parts and/or labor (during
the applicable parts and labor warranty periods speciļ¬ ed above) to repair the defective components, provided that this
repair is done by a BUNN Authorized Service Representative; or 2) shall replace the equipment or refund the purchase
price for the equipment.
THE BUYERā€™S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS
EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AT BUNNā€™S SOLE OPTION
AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND.
In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost proļ¬ ts, lost sales, loss of
use of equipment, claims of Buyerā€™s customers, cost of capital, cost of down time, cost of substitute equipment, facilities
or services, or any other special, incidental or consequential damages.
37235 050205
Page 4
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until speciļ¬ ed in Initial Set-Up.
120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.
"A" model brewers require 2-wire, grounded service rated 230 volts ac, 10 amp, single phase, 50 Hz.
"B" model brewers require 2-wire, grounded service rated 100 volts ac, 15 amp, single phase, 60 Hz.
WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with
a special cord available from the manufacturer or its service agent in order to avoid a hazard.
Proceed as follows:
Electrical Hook-Up
CAUTION ā€“ Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as speciļ¬ ed.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove top cover from the brewer.
4. Rotate the control thermostat knob fully counterclockwise to the "OFF" position and replace the top cover.
5. Connect the brewer to the power source.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for .Initial Set-Up
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20 (138) and 90
psi (620 kPa) from a 1ā„2" or larger supply line. A shut-off valve should be installed in the line before the brewer.
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The
water inlet ļ¬ tting is 1ā„ " ļ¬‚ are.4
NOTE - Bunn-O-Matic recommends 1ā„4" copper tubing for installations of less than 25 feet and 3ā„8" for more than 25
feet from the 1ā„2" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water ļ¬‚ ow.
This equipment must be installed to comply with the Basic Plumbing Code of the Building Ofļ¬ cials
and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the
Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply with
the applicable Plumbing/Sanitation Code for your area.
1. Remove the shipping cap from the bulkhead ļ¬ tting on the rear of the brewer.
2. Flush the water line and securely attach it to the bulkhead ļ¬ tting on the rear of the brewer.
3. Turn on the water supply.
NOTE: TheFlow Control/Strainer assembly is internal, located inside the back panel.
37235 050506


Produktspezifikationen

Marke: Bunn
Kategorie: Theemaker
Modell: TB3

Brauchst du Hilfe?

Wenn Sie Hilfe mit Bunn TB3 benƶtigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten