MGEâ„¢ Galaxyâ„¢ 3500
10-30 kVA 208/220 V with batteries
IMPORTANT SAFETY INSTRUCTIONS
- SAVE THESE INSTRUCTIONS
Warning: ALL safety instructions in the Safety Sheet
(990-2940) must be read, understood and followed when
installing the UPS system. Failure to do so could result in
equipment damage, serious injury, or death.
Warning: After the UPS has been electrically wired, do
not start it up. Start-up is commissioned to authorized
personnel from Schneider Electric.
Caution: All electrical power and power control wiring
must be installed by a qualified electrician, and must comply
with local and national regulations for maximum power
rating.
Note: Ensure that the unit is in its final location prior to
installation.
Note: Battery and utility power must not be connected until
all other wiring has been completed.
See Also: For parallel configurations see manual 990-
3568.
Level the Enclosure
Warning: The system must be installed on a level floor.
The leveling feet will stabilize the enclosure, but will not
account for a badly sloped floor.
 Use a 13/14 mm wrench to adjust the four leveling feet.
 Ensure that the system is level.
Caution: Do not move the enclosure after the leveling feet
have been lowered.
Floor Anchoring (if applicable)
Anchor the UPS enclosure to the floor
Note: Floor-anchoring bolts are not provided with the UPS.
Purchase the bolts locally (minimum size: M8). Follow the
specifications given by the manufacturer of the floor
anchoring system when bolting the UPS system to the floor.
 Reuse the two transport brackets (one
on each side) that were used to secure the
UPS to the pallet during transport.
 Drill two to six holes in the floor for
each bracket. Attach with bolts.
Prepare for Cables
Bottom cable entry
 From the rear of the UPS, loosen the six
M4 screws from the upper cover (the cable
landing area), and remove. Save the screws
for later use.
 Loosen the two M4 screws (one on each
side) from the top part of the conduit box.
Loosen the M4 screws attaching it to the
bottom part (two screws in a 352 mm (13.8
in) enclosure), (three screws in a 523 mm
(20.50 in) enclosure) and remove. Save the
screws for later use.
 Loosen the four M4 screws (two on each
side) from the conduit box bottom and
remove. Save the screws for later use.
 Punch as many holes as
needed in the marked areas
of the bottom conduit box.
 Attach the conduit box
bottom to the enclosure
(reuse the screws from step
.
 Attach conduits to the
conduit box.
 Run the cables through
the conduits, the bottom of
the conduit box, and up into
the cable landing area.
 Attach the conduit box top to the conduit box bottom, and to the
enclosure reusing the screws from step .
 Fasten the cables with cable ties.
UPS
UPS XR battery enclosure









Bypass
Output
Battery
Mains






2
Connect the AC Input and AC
Output Cables
Warning: Use compression type lugs ONLY.
Do not loosen or add cables to any factory preinstalled
cables on busbars. Use upper part of busbar for
connection only.
Single mains
 Connect the AC input cables
and the neutral to the input
cable landings.
 Connect the AC output
cables and the neutral to the
output cable landings.
 Connect the ground cables to
the studs (earth symbol
beneath) using a screw.
Dual mains Connect the DC Battery Cables
(if applicable)
 Connect battery
cables BAT+, BAT–, and
N to the battery cable
landings.
Connect the Communication
Cables
Warning: Make sure that the UPS is completely OFF as
the connectors are very close to the power busbars.
J106 and J108 pin connections
Note: The UPS must be connected to either a dry contact or
a 24 VDC EPO (Emergency Power Off) switch.
Note: The external EPO +24 VDC, 1500 mA circuit can be
supplied through other vendors.
Note: Always follow the pin connection procedures from
the top and work down: J106 (8-1), J108 (1-6).



 Remove the
three busbars A,
B, and C by
removing two M6
screws from each
busbar.
 Connect the AC
input cables and
the neutral to the
input cable
landings.
 Connect the
bypass cables and
the neutral to the
bypass cable
landings.
 Connect the
output cables and
the neutral to the
output cable
landings.
 Connect the
ground cables to
the studs (earth
symbol beneath)
using a screw.


J108 pin connections:
1 Normally open EPO
2 Normally open EPO return
3 Normally closed EPO
4 Normally closed EPO return
5 +24 V SELV supply
6 SELV ground



J106 pin connections:
8 Ext. charging control return
7 External control of charging
6 Q3 active return
5 Q3 active
4 Battery measurement supply*
3 Battery unit quantity*
2 Max. battery temperature*
1 Battery measurement return*
* Should be used with APC XR
Enclosures


Produktspezifikationen

Marke: APC
Kategorie: UPS
Modell: MGE Galaxy 3500

Brauchst du Hilfe?

Wenn Sie Hilfe mit APC MGE Galaxy 3500 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung UPS APC

Bedienungsanleitung UPS

Neueste Bedienungsanleitung für -Kategorien-