Hisense APH12 Bedienungsanleitung

Hisense Airco APH12

Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für Hisense APH12 (75 Seiten) in der Kategorie Airco. Dieser Bedienungsanleitung war für 11 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/75
Thank you very much for purchasing this Air Conditioner. Please
read this use and installation instructions carefully before installing
and using this appliance and keep this manual for future reference.
ENGLISH ESPAÑOL PORTUGUÊS NEDERLANDS FRANÇAIS РУССКИЙ ЯЗЫК DEUTSCH
ITALIANO
Safety precautions
3
CAUTION
6-5 Presence of fire extinguisher
If any hot work is to be conducted on the refrigeration equipment or any
associated parts, appropriate fire extinguishing equipment shall be available
to hand.
Have a dry powder or CO2 fire extinguisher adjacent to the charging area.
6-6 No ignition sources
No person carrying out work in relation to a refrigeration system which involves
exposing any pipe work that contains or has contained flammable refrigerant
shall use any sources of ignition in such a manner that it may lead to the risk of
fire or explosion.
All possible ignition sources, including cigarette smoking, should be kept
sufficiently far away from the site of installation, repairing, removing and
disposal, during which flammable refrigerant can possibly be released to the
surrounding space.
Prior to work taking place, the area around the equipment is to be surveyed to
make sure that there are no flammable hazards or ignition risks.No Smoking
signs shall be displayed.
6-7 Ventilated area
Ensure that the area is in the open or that it is adequately ventilated before
breaking into the system or conducting any hot work.
A degree of ventilation shall continue during the period that the work is carried
out.
The ventilation should safely disperse any released refrigerant and preferably
expel it externally into the atmosphere.
6-8 Checks to the refrigeration equipment
Where electrical components are being changed, they shall be fit for the
purpose and to the correct specification.
At all times the manufacturer's maintenance and service guidelines shall be
followed. If in doubt consult the manufacturer's technical department for
assistance.
The following checks shall be applied to installations using flammable
refrigerants:
The charge size is in accordance with the room size within which the
refrigerant containing parts are installed;
The ventilation machinery and outlets are operating adequately and are not
obstructed;
If an indirect refrigerating circuit is being used, the secondary circuit shall be
checked for the presence of refrigerant;
Marking to the equipment continues to be visible and legible. Markings and
signs that are illegible shall be corrected;
Refrigeration pipe or components are installed in a position where they are
unlikely to be exposed to any substance which may corrode refrigerant
containing components, unless the components are constructed of materials
Safety precautions
7
CAUTION
c) Before attempting the procedure ensure that:
Mechanical handling equipment is available, if required, for handling
refrigerant cylinders;
All personal protective equipment is available and being used correctly;
The recovery process is supervised at all times by a competent person;
Recovery equipment and cylinders conform to the appropriate standards.
d) Pump down refrigerant system, if possible.
e) If a vacuum is not possible, make a manifold so that refrigerant can be
removed from various parts of the system.
f) Make sure that cylinder is situated on the scales before recovery takes
place.
g) Start the recovery machine and operate in accordance with manufacturer's
instructions.
h) Do not overfill cylinders. (No more than 80 % volume liquid charge).
I ) Do not exceed the maximum working pressure of the cylinder, even
temporarily.
j ) When the cylinders have been filled correctly and the process completed,
make sure that the cylinders and the equipment are removed from site
promptly and all isolation valves on the equipment are closed off.
k) Recovered refrigerant shall not be charged into another refrigeration system
unless it has been cleaned and checked.
15.Labelling
Equipment shall be labelled stating that it has been de-commissioned and emptied
of refrigerant.
The label shall be dated and signed.
Ensure that there are labels on the equipment stating the equipment contains
flammable refrigerant.
16.Recovery
When removing refrigerant from a system, either for servicing or
decommissioning, it is recommended good practice that all refrigerants are
removed safely.
When transferring refrigerant into cylinders, ensure that only appropriate
refrigerant recovery cylinders are employed.
Ensure that the correct number of cylinders for holding the total system charge
is available.
All cylinders to be used are designated for the recovered refrigerant and
labelled for that refrigerant (i.e. special cylinders for the recovery of
refrigerant).
Cylinders shall be complete with pressure relief valve and associated shut-
off valves in good working order.
Empty recovery cylinders are evacuated and, if possible, cooled before
recovery occurs.
The recovery equipment shall be in good working order with a set of

Produktspezifikationen

Marke: Hisense
Kategorie: Airco
Modell: APH12

Brauchst du Hilfe?

Wenn Sie Hilfe mit Hisense APH12 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Airco Hisense

Bedienungsanleitung Airco

Neueste Bedienungsanleitung für -Kategorien-