Epson ELPMBC03 Bedienungsanleitung

Epson Beamer ELPMBC03

Lesen Sie kostenlos die đź“– deutsche Bedienungsanleitung fĂĽr Epson ELPMBC03 (16 Seiten) in der Kategorie Beamer. Dieser Bedienungsanleitung war fĂĽr 3 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet

Seite 1/16
1
ELPMBC02 / ELPMBC03 / ELPMBC04
9-12" (229-305mm) Adjustable Length Column
6" (152mm) Fixed Extension Column
3" (76mm) Fixed Extension Column
DISCLAIMER
Milestone AV Technologies and its affiliated corporations and
subsidiaries (collectively “Milestone”), intend to make this
manual accurate and complete. However, Milestone makes no
claim that the information contained herein covers all details,
conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this
product. The information contained in this document is subject
to change without notice or obligation of any kind. Milestone
makes no representation of warranty, expressed or implied,
regarding the information contained herein. Milestone assumes
no responsibility for accuracy, completeness, or sufficiency of
the information contained in this document.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the instructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the
corresponding instructions.
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury,
damage to equipment, or voiding of factory warranty! It is the
installer’s responsibility to make sure all components are
properly assembled and installed using the instructions
provided
WARNING: Failure to provide adequate structural strength
for this component can result in serious personal injury or
damage to equipment! It is the installer’s responsibility to
make sure the structure to which this component is attached
can support five times the combined weight of all equipment.
Reinforce the structure as required before installing the
component.
WARNING: Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer’s responsibility to make sure the combined weight of
all components attached to the ELPMBC02/ELPMBC03/
ELPMBC04 does not exceed 500 lbs (226 kg).
• The weight capacity of the ELPMBC02/ELPMBC03/
ELPMBC04 may be LIMITED to the lowest weight
capacity of any other component or accessory used
within the mounting system.
WARNING: Do not use this product outdoors.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use
attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a service center for
examination and repair.
NOTE: ELPMBC02/ELPMBC03/ELPMBC04 are Listed for use
with ELPMBP04, ELPMBP05, ELPMBP06,
ELPMBP07 AND ELPMBPRH ceiling plates and
mounts specified for use with 1-1/2" NPT following
ANSI/ASME B1.20.1 (Schedule 40, 0.154" minimum
thickness, steel or aluminum - ASTM B221) extension
columns. ELPMBC02 / ELPMBC03 / ELPMBC04
extension columns are suitable for a maximum 500 lbs
(226 kg).
--SAVE THESE INSTRUCTIONS--
TOOLS REQUIRED
5/32" - security
3/16"
PARTS
[Adjustable length]
A (1)
[Fixed length]
OR
B (1)
C (1)
5/16" x 5/8" D (1)
5/16"
E (1)
5/16"
F (2)
5/16" x 1/4" H (2)
5/16" x 1/4"
(security)
G (1)
5/32"
A (1)
(security)
J (1)
3/16"
NOTE: Parts B-J are only included with adjustable length
columns.
Installation Instructions
2
FIXED LENGTH EXTENSION COLUMN
IMPORTANT ! : The following procedure assumes that
the ceiling plate/adapter (not included) has been properly
installed following instructions provided with ceiling plate/
adapter.
NOTE: Intended for use with Chief accessories and mounts.
1. Install 1-1/2" NPT threaded column (A) into plate/adapter
(See Figure 1). Securely tighten column.
• Ensure column (A) engages four full threads into
plate/adapter.
Figure 1
2. Secure column (A) by tightening set screw in plate/adapter
(See Figure 1).
NOTE: Hex key and set screw provided with plate/adapter.
WARNING: Exceeding the weight capacity can result in
serious personal injury or damage to equipment! It is the
installer’s responsibility to make sure the combined weight of
all components attached to the ELPMBC02/ELPMBC03/
ELPMBC04 columns do not exceed 500 lbs (226 kg).
• The weight capacity of the ELPMBC02/ELPMBC03/
ELPMBC04 columns may be LIMITED to the lowest
weight capacity of any other component or accessory
used within the mounting system.
3. Install and secure projector/display mount (not included) to
lower end of column (A) following instructions included with
mount.
ADJUSTABLE LENGTH EXTENSION
COLUMN
IMPORTANT ! : The following procedure assumes that
the ceiling plate/adapter (not included) has been properly
installed following instructions provided with ceiling plate/
adapter.
NOTE: Intended for use with Chief accessories and mounts.
1. Install 1-1/2" NPT threaded column (A or B, as applicable)
into plate/adapter (See Figure 2). Securely tighten column.
• Ensure column (A or B, as applicable) engages four full
threads into plate/adapter.
Figure 2
2. Secure column (A or B, as applicable) by tightening set
screw in plate/adapter (See Figure 2).
NOTE: Hex key and set screw provided with plate/adapter.
3. Install mating column (A or B, as applicable) (See Figure 2).
1
2
A
2
1
B
A
3
Installation Instructions
3
4. Using key (J), loosely install screw (C) through lock washer
(D), flat washer (E), and outer column (B) into adjustment
hole in inner column (A) (See Figure 3).
NOTE: Two adjustment holes provided in columns 6" or longer
(152mm) in length. Either adjustment hole can be used
to provide 1" (25mm) adjustment increments.
Figure 3
5. Adjust column (A or B, as applicable) to desired length, then
rotate and lock into position (See Figure 3).
NOTE: Any locking slot can be used to provide 2" (51mm)
adjustment increments.
6. Tighten screw (C) using key (J) (See Figure 3).
7. Install and tighten set screws (standard (F) or security (G),
as desired) using key (J) (See Figure 4).
Figure 4
8. Install and secure projector/display mount (not included) to
lower end of column (A or B, as applicable) following
instructions included with mount.
46
5
CDE
B
A
7
F x 2
G x 2
1.90 OD
2.31 OD
1.0
FULLY EXTENDED
ALL THREADS
1-1/2" NPT
MIN LENGTH
OUTER TUBE
LENGTH
1.00
1.00
FULLY RETRACTED
1.50 ID
LENGTH


Produktspezifikationen

Marke: Epson
Kategorie: Beamer
Modell: ELPMBC03

Brauchst du Hilfe?

Wenn Sie Hilfe mit Epson ELPMBC03 benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten




Bedienungsanleitung Beamer Epson

Bedienungsanleitung Beamer

Neueste Bedienungsanleitung fĂĽr -Kategorien-