CDA KA82SS Bedienungsanleitung
Lesen Sie kostenlos die 📖 deutsche Bedienungsanleitung für CDA KA82SS (4 Seiten) in der Kategorie Spoelbak. Dieser Bedienungsanleitung war für 9 Personen hilfreich und wurde von 2 Benutzern mit durchschnittlich 4.5 Sternen bewertet
Seite 1/4
www.cda.eu
ka30, ka32,
ka80 and ka82
Stainless Steel
Sinks
Installation
2
Installation
Before Installation
Oer up the sink to the worktop and/or the cabinets to confirm that
the external dimensions of the bowls are compatible with the cabinets
themselves.
Confirm that with the sink in position:
• There is adequate space to install any taps or other required
accessories.
• There is adequate space to install the waste pipework and that any
necessary modification to internal shelves to accommodate the waste
(and trap) is acceptable.
• Access to any water stop-cock or other services will still be adequate
after the installation.
Installation
• Refer to the cut-out sizes on the back of this manual and use them
to mark out where the worktop needs to be cut. Double-check the
dimensions before cutting the worktop aperture.
• After cutting out the worktop aperture, we recommend you seal the
cut edges with silicone (or similar) sealant to help prevent ingress of
water.
• Position the supplied gasket around
the perimeter of the hole (Fig. 1).
• It is often easier to mount the taps,
waste-fitting and overflow onto the sink
prior to fitting the sink to the worktop.
• Ensure that the external edge of the
sink is positioned on the gasket, to Fig. 1
3
E & O E. All instructions, dimensions and illustrations are provided for guidance only. CDA reserve the
right to change specifications without prior notice.
create a barrier to the ingress
of water and other items between sink
and worktop.
• After positioning the sink on the
worktop, position the fixing brackets
as shown in Fig. 2, then tighten their
screws.
• Do not use a power tool to tighten
the screws; by using a hand tool
it is easier to ensure that they are
tightened just enough to clamp down on the worktop and no
more.
• After fixing, remove any excess gasket material with a suitable cutter.
• We recommend a thin bead of silicone sealer is applied around the
perimeter as added protection against water ingress.
• The taps, waste-fitting and overflow can now be mounted onto the
sink (if not already done) and fully connected to their respective
services.
• To check the waste for leaks, close the plug/basket of the waste
fitting, open the tap and fill the sink to the level of the overflow; turn
o the tap and wait several minutes to verify that the water doesn’t
drain away.
• Empty the sink.
After fitting, ensure that the enclosed “Stainless Steel Sinks Use and
Maintenance” guide is retained for the customer and/or user of the
sink.
Fig. 2
Produktspezifikationen
Marke: | CDA |
Kategorie: | Spoelbak |
Modell: | KA82SS |
Brauchst du Hilfe?
Wenn Sie Hilfe mit CDA KA82SS benötigen, stellen Sie unten eine Frage und andere Benutzer werden Ihnen antworten
Bedienungsanleitung Spoelbak CDA
20 August 2024
19 August 2024
16 August 2024
14 August 2024
14 August 2024
14 August 2024
14 August 2024
13 August 2024
12 August 2024
12 August 2024
Bedienungsanleitung Spoelbak
- Spoelbak Concept
- Spoelbak Teka
- Spoelbak Smeg
- Spoelbak Caple
- Spoelbak Kernau
- Spoelbak Franke
- Spoelbak Foster
- Spoelbak Leisure
- Spoelbak Nodor
- Spoelbak Schock
- Spoelbak Rangemaster
- Spoelbak BLANCO
- Spoelbak Elkay
- Spoelbak Deante
- Spoelbak Sani-Lav
- Spoelbak Roca
- Spoelbak Artusi
- Spoelbak Advance Tabco
- Spoelbak Tot Mate
- Spoelbak Kuchinox
- Spoelbak Oliveri
- Spoelbak Shaws
Neueste Bedienungsanleitung für -Kategorien-
18 September 2024
17 September 2024
16 September 2024
15 September 2024
14 September 2024
14 September 2024
14 September 2024
12 September 2024
10 September 2024
8 September 2024